RTA logo Projects in the 2019-2023 Capital Program for All Service Boards

This page provides a list of all the projects in the 2019-2023 capital program and their programmed budget for the current year and out years. The charts show the current year funding by service board and mode, and the distribution of funding, as a percentage, by asset category for all service boards. (The chart is not displayed if there is a single service board/mode or asset category.) Column heading key:

Totals By Service Board and Mode
Totals By Program Category
*Other includes Miscellaneous, Acquisitions & Extensions, and Contingencies & Administration.

Click on a column header to sort the table by that column.

Project # Service Board Mode Asset Category Title TIP ID Current Year Funding (2019) Future Years Funding (2020-2023)
404.502CTABusModernizationAshland Avenue Transit Signal Prioirty and Signal Modernization (Irving to Cermak)16-13-0005$0$8,801,948
021.500CTABusRolling StockPerform Bus Maintenance Activities (P1)16-12-0009$40,000,000$9,100,000
031.502CTABusRolling StockReplace Buses - Electric (20 Base_25 Option) w Charger (5 Base_8 Option)16-14-0001$7,924,000$0
021.503CTABusRolling StockLife Extending Overhaul - 430 Standard (1000 Series)16-17-0001$0$53,252,241
021.504CTABusRolling StockMid-Life Bus Overhaul - 100 Artic (4300/4333 Series)16-17-0001$0$19,107,750
031.503CTABusRolling StockReplace Buses - (150 of 1,030 New Flyers)16-96-0061$0$91,589,400
031.504CTABusRolling StockReplace Buses - Artic Hybrid - Lease Principal16-96-0061$14,454,413$3,955,850
031.505CTABusRolling StockReplace Remaining (6400 Series) 50 Base/Plus 50 Option - Standard16-96-0061$0$35,604,546
031.054CTABusRolling StockPurchase a Minimum of 366 Replacement Buses (266 of 426 Flxible and 100 of 490 TMC, Partial $) -- Systemwide$7,371,621$0
302.287CTARailContingencies & AdministrationSupport Services for Fast Tracks Program - Long Term$360,897$1,278,280
121.506CTARailElectrical, Signal, & CommunicationsTactical Traction Power (Equipment/Cable/Enclosures)16-00-0030$0$8,393,750
121.510CTARailElectrical, Signal, & CommunicationsBlue Line O'Hare Branch Traction Power Improvements16-00-0030$5,994,182$18,348,104
254.001CTARailExtensionsExtend Red Line South (EIS) -- Red Line01-94-0006$0$40,247,002
254.001CTARailExtensionsExtend Red Line South (EIS) -- Red Line$1,480,000$0
406.024CTARailMiscellaneousBlue Line Core Capacity Study$404,124$323,730
302.901CTARailModernizationNML - Red/Purple Modernization - Support Service CMAQ16-10-9001$1,213,258$3,853,644
304.004CTARailModernizationRehabilitate North Mainline -- Red Line16-10-9001$196,869,637$625,312,654
079.502CTARailModernizationRehabilitate Blue Line - Kimball Subway Waterproofing and Track includes TOD16-14-0007$0$1,975,000
121.509CTARailModernizationRehabilitate Blue Line -(Jeff Park to ORD) Signals (Phase 5)16-14-0007$0$11,330,879
141.273CTARailModernizationReconstruct a Minimum of 5 Rail Stations (Partial $) -- Howard/ Red Line, O'Hare/ Blue Line and Evanston/ Purple Line16-14-0007$0$8,638,067
170.501CTARailModernizationRehabilitate Blue Line- Harlem Station Bus Bridge16-14-0007$0$9,875,000
406.029CTARailModernizationNext Phases of Red Purple Modernization Core Capacity Expansion Program- UWP$404,619$0
022.503CTARailRolling StockPerform Rail Car Maintenance Activities (P1)16-12-0010$42,986,698$8,800,000
022.506CTARailRolling StockRail Car Activities - Traction Motor & Armatures Phase II16-12-0010$0$0
132.501CTARailRolling StockPurchase Rail Cars - 7000' Series (Base Order 400)16-15-0005$0$191,990,904
022.504CTARailRolling Stock5000 Series Qtr Overhaul - Base of 283 cars16-17-0002$3,621,674$151,374,443
022.505CTARailRolling Stock5000 Series Qtr Overhaul - Critical Needs 16-17-0002$10,695,127$0
022.504CTARailRolling Stock5000 Series Qtr Overhaul - Base of 283 cars$6,548,027$0
022.508CTARailRolling StockPerform Rail Car Activities - Install Rail Car Simulator$976,590$0
022.906CTARailRolling StockPerform "C" Overhaul Rail Car Activities$12,731,607$0
0371CTARailStations & Passenger FacilitiesIrving Park Station Escalators (Blue Line - YNB)16-02-0004$6,000,000$0
143.500CTARailStations & Passenger FacilitiesRehabilitate Rail Stations - Systemwide16-02-0004$0$13,825,000
143.514CTARailStations & Passenger FacilitiesStation Security Enhancements16-99-002$2,923,716$8,949,452
070.504CTARailSupport Facilities & EquipmentReplace Non-Revenue 61st Rail Shop16-17-0006$0$66,125,000
070.510CTARailSupport Facilities & EquipmentRail Facilites (Yards) - SOGR II16-99-0002$3,579,189$26,125,371
070.512CTARailSupport Facilities & EquipmentImprove Facilities - 74th Garage$2,464,342$0
184.500CTARailTrack & StructureRepair Track and Structure -- Systemwide16-98-0015$24,812,500$59,250,000
184.512CTARailTrack & StructureGreen Line South - Track Improvements16-98-0015$9,866,131$30,200,081
184.513CTARailTrack & StructureGreen & Pink Line West - Track Improvements16-98-0015$4,981,982$15,249,773
184.514CTARailTrack & StructureRed & Blue Line Subway - Track Improvements16-98-0015$5,237,854$16,032,995
184.515CTARailTrack & StructureBrown Line - Track Improvements16-98-0015$4,142,872$12,681,269
184.516CTARailTrack & StructureCongress Blue Line - P1 Track16-98-0015$974,572$2,983,151
181.500CTARailTrack & StructureRenew Right-of-Way and Footwalk -- State Street Subway and Ravenswood Line$8,529,516$0
306.001CTASystemContingencies & AdministrationProvide for Program Management -- Systemwide16-01-0008$6,013,875$26,425,500
302.088CTASystemContingencies & AdministrationSupport Service for 5307$1,219,381$6,563,834
302.089CTASystemContingencies & AdministrationSupport Service for 5337$1,628,427$7,769,937
302.090CTASystemContingencies & AdministrationSupport Service for 5339$132,581$626,072
302.092CTASystemContingencies & AdministrationSupport Service for CMAQ$76,000$88,909
302.093CTASystemContingencies & AdministrationSupport Service for HLS$57,000$294,600
302.095CTASystemContingencies & AdministrationSupport Service for RTA Bonds$0$1,537,500
302.096CTASystemContingencies & AdministrationSupport Services for CTA Bond$242,445$1,617,645
302.097CTASystemContingencies & AdministrationSupport Service for UWP $3,881$0
302.098CTASystemContingencies & AdministrationSupport Service for ILRTP$8,626$8,020
406.003CTASystemContingencies & AdministrationProgram Development - UWP$525,000$2,100,000
150.502CTASystemElectrical, Signal, & CommunicationsSystemwide Security Cameras Improvements (Safe & Secure)16-03-0011$3,506,954$10,734,735
0187CTASystemElectrical, Signal, & CommunicationsPurchase Equipment-Quality Assurance$528,671$0
0376CTASystemElectrical, Signal, & CommunicationsImplement Transit System Initiative$570,459$0
150.500CTASystemMiscellaneousImplement Security Projects (2004, CTA Bonds, $178,735+$30,571,265=$30,750,000) -- Systemwide16-03-0011$5,943,000$23,705,400
292.002CTASystemMiscellaneousProvide for Unanticipated Capital$835,641$0
086.503CTASystemSupport Facilities & EquipmentEquipment and Non-Revenue Vehicles (Diesel Locomotives)16-13-0003$0$3,806,260
061.500CTASystemSupport Facilities & EquipmentUpgrade Office Computer Systems16-98-0003$0$5,200,000
061.501CTASystemSupport Facilities & EquipmentUpgrade\Support IT & Communication Systems16-98-0003$0$1,600,000
062.029CTASystemSupport Facilities & EquipmentP/I Mainframe Computer Replacement16-98-0003$495,250$470,250
070.500CTASystemSupport Facilities & EquipmentOffice Building - Principal16-99-0002$6,187,413$24,755,582
070.503CTASystemSupport Facilities & EquipmentFacilities Maintenance16-99-0002$18,965,747$23,700,000
070.505CTASystemSupport Facilities & EquipmentFacilities Maintenance16-99-0002$4,913,362$0
070.511CTASystemSupport Facilities & EquipmentFacilities (Critical Needs) - SOGR II16-99-0002$2,468,750$2,436,891
5397MetraRailContingencies & AdministrationLOCALLY FUNDED PROJECTS / MATCH$87,459$4,027,600
5398MetraRailContingencies & AdministrationPROJECT ADMINISTRATION$1,000,000$4,600,000
5399MetraRailContingencies & AdministrationCONTINGENCIES$1,900,441$7,971,722
4343MetraRailElectrical, Signal, & CommunicationsPositive Train Control (PTC)$28,983,670$0
4746MetraRailElectrical, Signal, & CommunicationsImpedance Bonds$0$700,000
4841MetraRailElectrical, Signal, & CommunicationsCUS SOUTH INTERLOCKERS$2,450,000$0
4842MetraRailElectrical, Signal, & Communications16th Street Interlocker$200,000$0
4947MetraRailElectrical, Signal, & CommunicationsA20 Interlocker$585,000$0
5149MetraRailElectrical, Signal, & CommunicationsLake Street Interlocker$2,300,000$22,700,000
5254MetraRailElectrical, Signal, & CommunicationsSignal System Upgrades$0$1,000,000
5257MetraRailElectrical, Signal, & CommunicationsRONDOUT INTERLOCKING RENEWAL$3,000,000$0
5350MetraRailElectrical, Signal, & CommunicationsCommunication Improvements$1,550,000$0
5352MetraRailElectrical, Signal, & CommunicationsSignal Standards$600,000$0
5353MetraRailElectrical, Signal, & CommunicationsSIGNAL SYSTEM UPGRADES$250,000$300,000
5355MetraRailElectrical, Signal, & CommunicationsSIGNAL SYSTEM UPGRADES$100,000$700,000
5356MetraRailElectrical, Signal, & CommunicationsYARD IMPROVEMENTS- ELEC$900,000$3,450,000
5357MetraRailElectrical, Signal, & CommunicationsYARD IMPROVEMENTS - ELEC$440,000$1,760,000
5358MetraRailElectrical, Signal, & CommunicationsYARD IMPROVEMENTS - ELEC$750,000$4,150,000
5359MetraRailElectrical, Signal, & CommunicationsYARD IMPROVEMENTS _ ELEC$1,320,000$3,090,000
5360MetraRailElectrical, Signal, & CommunicationsHVAC REPLACEMENTS$1,000,000$0
5361MetraRailElectrical, Signal, & CommunicationsMORGAN INTERLOCKING$600,000$6,000,000
5362MetraRailElectrical, Signal, & CommunicationsWESTERN INTERLOCKING$0$6,000,000
5363MetraRailElectrical, Signal, & CommunicationsRECTIFIER REPLACEMENT$1,500,000$2,000,000
5364MetraRailElectrical, Signal, & CommunicationsVIDEO SYS STORAGE$2,000,000$4,000,000
CC-104MetraRailElectrical, Signal, & CommunicationsBI-DIR SIGNAL (47TH TO 65TH)$0$7,000,000
CC-105MetraRailElectrical, Signal, & CommunicationsBI-DIR SIGNAL (11TH TO 47TH)$0$10,000,000
CC-106MetraRailElectrical, Signal, & CommunicationsA-20 INTERLOCKING$0$12,000,000
5195MetraRailMiscellaneousEngineering Asset Management$750,000$1,500,000
5390MetraRailMiscellaneousINFRASTRUCTURE ENGINEERING$500,000$4,000,000
5391MetraRailMiscellaneousINFRASTRUCTURE ENGINEERING$500,000$4,000,000
5392MetraRailMiscellaneousINFRASTRUCTURE ENGINEERING$1,000,000$8,000,000
5393MetraRailMiscellaneousINFRASTRUCTURE ENGINEERING$1,000,000$7,500,000
5394 MetraRailMiscellaneousINFRASTRUCTURE ENGINEERING$500,000$4,000,000
5395MetraRailMiscellaneousINFRASTRUCTURE ENGINEERING$1,000,000$8,500,000
5396MetraRailMiscellaneousUNANTICIPATED CAPITAL$600,000$3,488,000
ICE2021MetraRailMiscellaneousRTA ICE FUNDED PROJECTS - TBD$0$5,245,654
5006MetraRailRolling StockPurchase New Gallery Cars$2,700,000$173,000,000
5009MetraRailRolling StockRail Car Rehabilitation (Nippon Sharyo Highliners)$0$51,628,000
5010MetraRailRolling StockReplacement of Car and Locomotive Cameras$2,500,000$9,000,000
5109MetraRailRolling StockPurchase Locomotives$83,300,000$116,719,000
5204MetraRailRolling StockLocomotive Rehabilitation$8,000,000$22,835,000
5207MetraRailRolling StockCar Rehabilitation (Nippon Sharyo P-3)$12,100,000$19,375,000
5301MetraRailRolling StockTRACTION MOTORS $2,000,000$7,400,000
5302MetraRailRolling StockLocomotive and Rail Car Improvements$2,000,000$8,000,000
5303MetraRailRolling StockWHEEL REPLACEMENT$3,000,000$12,000,000
5307MetraRailRolling StockCAR REHAB (NIPPON SHARYO P-4)$0$25,850,000
5309MetraRailRolling StockPurchase New Locomotives$56,000,000$0
AE-104MetraRailRolling StockCAR REHAB (NIPPON SHARYO P-5)$0$19,324,000
AE-105MetraRailRolling StockCAR REHAB (NIPPON SHARYO P-6)$0$15,500,000
AE-106MetraRailRolling StockCAR REHAB (NIPPON SHARYO P-7)$0$12,000,000
4479MetraRailStations & Passenger Facilities59th Street Station18-10-0046$2,500,000$0
4484MetraRailStations & Passenger FacilitiesAuburn Station - RID$20,000,000$0
4486MetraRailStations & Passenger FacilitiesPeterson Ridge Station$15,000,000$0
4675MetraRailStations & Passenger FacilitiesBlue Island Vermont Street Station$1,060,882$0
4782MetraRailStations & Passenger FacilitiesHUBBARD WOODS STATION$5,530,000$0
4878MetraRailStations & Passenger FacilitiesWEST CHICAGO STATION$0$5,000,000
5077MetraRailStations & Passenger FacilitiesStation Signs$0$750,000
5380MetraRailStations & Passenger FacilitiesADA IMPROVEMENTS$3,000,000$12,000,000
5381MetraRailStations & Passenger FacilitiesSYSTEMWIDE STATION IMPS$500,000$2,700,000
5382MetraRailStations & Passenger FacilitiesSTATION FAC IMPROVEMENTS$1,500,000$6,250,000
5383MetraRailStations & Passenger FacilitiesPARKING LOT IMPROVEMENTS$500,000$2,000,000
5384MetraRailStations & Passenger FacilitiesELMHURST$1,000,000$1,000,000
5385MetraRailStations & Passenger FacilitiesNEW LENOX$1,000,000$1,000,000
EA-100MetraRailStations & Passenger FacilitiesBICYCLE PARKING$0$382,400
EC-00MetraRailStations & Passenger Facilities147TH STREET STATION$0$5,000,000
4757MetraRailSupport Facilities & EquipmentMILLENIUM STATION EXITS$1,300,000$0
4852MetraRailSupport Facilities & EquipmentFinancial System Replacement$0$5,000,000
4972MetraRailSupport Facilities & EquipmentYard Improvements$10,000,000$0
4992MetraRailSupport Facilities & EquipmentHybrid and Alternative Fuel Vehicles$663,360$0
5171MetraRailSupport Facilities & EquipmentGPS/Train Tracking$7,764,181$6,438,798
5265MetraRailSupport Facilities & EquipmentYard Improvements$1,400,000$3,600,000
5365MetraRailSupport Facilities & EquipmentYARD IMPROVEMENTS$3,000,000$10,000,000
5366MetraRailSupport Facilities & EquipmentYARD IMPROVEMENTS$1,500,000$3,800,000
5367MetraRailSupport Facilities & EquipmentYARD IMPROVEMENTS$1,000,000$3,500,000
5368MetraRailSupport Facilities & EquipmentYARD IMPROVEMENTS$1,000,000$2,000,000
5369MetraRailSupport Facilities & EquipmentRIGHT OF WAY EQUIPMENT$2,000,000$7,500,000
5370MetraRailSupport Facilities & EquipmentOFFICE EQUIPMENT$275,000$1,100,000
5371MetraRailSupport Facilities & EquipmentEQUIPMENT & VEHIC MECH$1,500,000$5,000,000
5372MetraRailSupport Facilities & EquipmentIT COMPONENTS & SERVICES$1,850,000$5,821,000
5373MetraRailSupport Facilities & EquipmentPOLICE VEHICLES$500,000$2,000,000
5374MetraRailSupport Facilities & EquipmentSTORAGE EQUIPMENT$600,000$0
5375MetraRailSupport Facilities & Equipment547 BUILDING SYS IMPROVEMENTS$250,000$950,000
5376MetraRailSupport Facilities & EquipmentLASALLE FIRE PROTECTION$520,000$0
4337MetraRailTrack & StructureGresham Area Bridges$6,500,000$0
4840MetraRailTrack & StructureNorth Line Bridges (Phased)$6,000,000$67,409,442
5240MetraRailTrack & StructureBridge A-32$12,000,000$0
5311MetraRailTrack & StructureTIES, BALLAST, & SW HEATERS$2,500,000$7,000,000
5312MetraRailTrack & StructureTIES AND BALLAST$0$8,500,000
5313MetraRailTrack & StructureTIES AND BALLAST (50/50)$1,600,000$9,000,000
5314MetraRailTrack & StructureTIES AND BALLAST (50/50)$1,250,000$1,000,000
5315MetraRailTrack & StructureTIES AND BALLAST$2,300,000$7,500,000
5316MetraRailTrack & StructureTIES AND BALLAST$1,500,000$0
5320MetraRailTrack & StructureNCS IMPROVEMENTS$798,000$4,071,000
5321MetraRailTrack & StructureUNDERCUTTING & SURFACING$250,000$1,000,000
5322MetraRailTrack & StructureUNDERCUTTING & SURFACING$500,000$1,250,000
5323MetraRailTrack & StructureUNDERCUTTING & SURFACING$400,000$1,100,000
5324MetraRailTrack & StructureUNDERCUTTING & SURFACING$500,000$1,000,000
5325MetraRailTrack & StructureRAIL REPLACEMENT$2,600,000$4,000,000
5326MetraRailTrack & StructureRAIL REPLACEMENT$250,000$2,000,000
5327MetraRailTrack & StructureRAIL REPLACEMENT$500,000$5,800,000
5328MetraRailTrack & StructureRAIL REPLACEMENT$250,000$9,600,000
5329MetraRailTrack & StructureRAIL REPLACEMENT$250,000$6,000,000
5330MetraRailTrack & StructureCREATE-P2$2,000,000$22,000,000
5331MetraRailTrack & StructureCROSSINGS (ROAD & TRACK)$1,000,000$4,000,000
5332MetraRailTrack & StructureCROSSINGS (ROAD & TRACK - 50/50)$1,250,000$6,000,000
5333MetraRailTrack & StructureCROSSINGS (ROAD & TRACK)$500,000$6,000,000
5334MetraRailTrack & StructureCROSSINGS (ROAD & TRACK)$1,000,000$4,000,000
5335MetraRailTrack & StructureCROSSINGS (ROAD & TRACK)$0$4,750,000
5336MetraRailTrack & StructureBRIDGES & RETAINING WALLS$2,500,000$4,000,000
5337MetraRailTrack & StructureBRIDGES $500,000$1,600,000
5338MetraRailTrack & StructureBRIDGES $500,000$1,000,000
5340MetraRailTrack & StructureROOT/43rd STREET BRIDGES$8,000,000$0
5344MetraRailTrack & StructureCATENARY STRUCTURE REHAB$1,750,000$3,100,000
5347MetraRailTrack & StructureRIGHT OF WAY FENCING$33,000$132,000
5348MetraRailTrack & StructureRIGHT OF WAY FENCING$34,000$136,000
5349MetraRailTrack & StructureRIGHT OF WAY FENCING$33,000$132,000
BL-104MetraRailTrack & StructureWESTERN AVENUE BRIDGE$0$4,000,000
BL-105MetraRailTrack & StructureHICKORY CREEK BRIDGE$0$4,000,000
5430PaceBusMiscellaneousUnanticipated Capital$250,000$1,000,000
5435PaceBusMiscellaneousTransit Asset Management (TAM) Program - Consulting Services$250,000$0
5375PaceBusRolling StockPurchase CNG Buses$3,076,920$0
5400PaceBusRolling StockPurchase 40' Fixed Route Buses$0$9,000,000
5401PaceBusRolling StockPurchase Fixed Route Buses$23,649,967$42,400,000
5402PaceBusRolling StockPurchase Paratransit Vehicles$5,462,703$15,015,000
5403PaceBusRolling StockPurchase Community/On-Demand Vehicles$0$5,293,351
5404PaceBusRolling StockPurchase Vanpool Vehicles$7,520,000$0
5405PaceBusRolling StockEngine/Transmission Retrofits$0$8,025,535
5320PaceBusStations & Passenger FacilitiesConstruction of approximately 29 Pulse Stations17-18-0001$10,040,500$0
5420PaceBusStations & Passenger FacilitiesImprove Passenger Facilities - Midlife Renovation17-94-0035$1,227,630$0
5420PaceBusStations & Passenger FacilitiesImprove Passenger Facilities - Midlife Renovation$0$23,150,000
5421PaceBusStations & Passenger FacilitiesBus Stop Shelters/Signs$750,000$4,000,000
5422PaceBusStations & Passenger FacilitiesBus Tracker Sign Deployment$500,000$0
5423PaceBusStations & Passenger FacilitiesPosted Stops Only Conversion$750,000$2,000,000
5424PaceBusStations & Passenger FacilitiesJoliet Transit Center$0$0
5425PaceBusStations & Passenger FacilitiesOrland Square Mall Passenger Facility$600,000$0
5313PaceBusSupport Facilities & EquipmentNew Northwest Division Garage$5,528,250$0
5410PaceBusSupport Facilities & EquipmentImprove Support Facilities$2,062,530$16,400,000
5411PaceBusSupport Facilities & EquipmentComputer Systems Hardware & Software$500,000$4,000,000
5412PaceBusSupport Facilities & EquipmentSupport Equipment/Non-Revenue Vehicles$600,000$4,000,000
5413PaceBusSupport Facilities & EquipmentFarebox System$250,000$17,500,000
5414PaceBusSupport Facilities & EquipmentAssociate Capital$6,000,000$12,000,000
5415PaceBusSupport Facilities & EquipmentPreventive Maintenance$3,000,000$27,671,000
5416PaceBusSupport Facilities & EquipmentOffice Equipment/Furniture$100,000$2,000,000
9999RTASystemMiscellaneousProvide for Improvements at 19 Priority Transit Transfer Location -- Systemwide16-94-0006$250,000$0
Total$928,968,104$2,825,657,921
Source: RTA Capital Program Database