Capital Projects

Regional Capital Program

Download Capital Dataset

Capital programming is a core function of the RTA. RTA and the Service Boards have worked to articulate as well as advance a capital strategy for transit projects in the Chicagoland region.

Priority Projects have been identified by the Service Boards. These priority projects were defined in the Invest in Transit  Regional Transit Strategic Plan and are updated on an annual basis. This page shows details about the funding for each priority project.

The 2024-2028 5-Year Regional Capital Program includes over 250 projects that are advancing many of these Priority Projects. The capital projects are shown in the table below, organized by Priority Project and can also be seen in a mapped form on the RTA Capital Projects Dashboard. Each project listing shows the amount of funding programmed in the 2024-2028 Regional Capital Program. Beginning with the 2024-2028 Capital Program, projects are evaluated based on 15 measure which were identified in the new Regional Transit Strategic Plan, Transit is the Answer. All projects in the 2024-2028 program show the detailed evaluations in this site.

The metrics include evaluations of Equity and Accessibility which are used in the performance-based allocation process. The region has committed to dedicating 20% of programmed funds to projects that fulfill the regional goals of improving equity and accessibility for 2025 and beyond as a part of the new performance-based capital allocation process

The Service Boards have met and exceeded the 20% goal for the 2025-2028 budget years.

Detailed analysis of the capital evaluation metrics is included in the Regional Transit Operating Budget and Capital Program

Read more about RTA’s capital programming activities here.

Project Management Oversite (PMO) data is provided for projects that are being actively monitored by the PMO group. Data included current activities, start and end date and budget and schedule status. The following page has a full list of active PMO projects.

 

Search More info

Filter

Core Requirement(s) More info

Strategic Goal More info

Agency Priority Project Mode 2023 Funding 2023-2027 Fundingsort descending 10 Year Funding Needed 10 Year Unfunded Need
+ CTA Blue Line (O'Hare) Traction Power Capacity & Track Improvements Rail $0 $0 $217,940,463 $217,940,463

Description:

Upgrades and State of Good Repair projects along the O'Hare Branch of the Blue Line

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Blue Line O'Hare Branch - Special Trackwork Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

Funds provide for the replacement of stock rails, switch points, frogs, switch ties, and plates on the O’Hare Line that are no longer in a state of good repair and require concentrated maintenance by CTA forces to ensure service. The component replacement will take place between the Jefferson Park interlocking and the O’Hare terminal.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$2,013,674
$0
$0
$2,013,674

Last Updated 12.16.2022

+ Blue Line O'Hare Branch Traction Power Improvements Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

Blue Line O'Hare Branch Traction Power Improvements GTT - Project will include targeted track repairs to remove existing slow zones on the Congress Branch of the Blue Line. CTA has identified traction power voltage drop issues along the Blue Line. Scope of work will include but not limited to the following elements: New infill substations, infill wayside energy storage systems, infill tie houses, third rail replacement, addition of auxiliary negative rail; work will be performed by an outside contractor.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$12,405,159
$0
$0
$12,405,159

PMO:

Total Project Budget^

$207,100,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

May 2018

End Date

Mar 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The contractor completed installation and testing of wayside signal equipment and all cutovers along the specific portion of the blue line. The project is considered substantially complete with the contractor performing punch list items. Final invoices remain and this will be the final update on this project.

Last Updated 06.22.2023

+ Blue Line Traction Power - Barry, Damen and Canal Electrical, Signal & Communications Rail $0 $0

PROJECT DETAILS

Description:

Construct a tie house (at the intersection of Milwaukee/Canal/Lake Street) and two new substations (at
Barry/Kimball intersection and Damen/Milwaukee intersection) to support traction power needs on the
Blue Line. These assets will support increasing ridership demands as well as the power needed to
support 5000 and 7000 series rail cars. The location of the tie house and substations were determined
by the Blue Line Load Flow study, which identified areas that were likely to experience traction power
issues.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$2,200,191
$0
$0
$2,200,191

PMO:

Total Project Budget^

$122,417,171

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Oct 2021

End Date

Jan 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Construction is ongoing at Canal, Damen and Haymarket, with majority of construction forces working at Damen Substation on structural steel installation and electrical work. Substation equipment factory testing is ongoing. A change order to add the scope for the Kimball Subway Belmont crossover has been authorized. Work on the Belmont-Kimball crossover is ongoing during the weekends. There are project delays associated with underground obstructions discovered at the Damen location during micropile installations. A workaround has been developed and a new permitting application process is ongoing.

Last Updated 06.22.2023

+ Old Mannheim Replacement Foot walk Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

Restore footwalk at Old Manheim on the O'Hare Line.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$250,000

Last Updated 12.16.2022

+ Traction Power Upgrades - Kedvale, Edmunds & Sacramento Substations Electrical, Signal & Communications Rail $0 $0

PROJECT DETAILS

Description:

This project will Provide for AC breaker replacement at Kedvale, Edmunds and Sacramento substations. This will also include the replacement of oil (non‐PCB) transformer and rectifiers along with roof and doors replacement at the Kedvale and Sacramento substations.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$12,030,427

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Apr 2022

End Date

Jan 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The contractor was able to install the transformers, rectifiers, as well as roof and door replacements since the last reporting period. The project reachedsubstantial completion in January 2023 and punchlist items were completed. Final invoices remain. This will be the final update on this project.

Last Updated 06.22.2023

+ CTA Blue Line Forest Park Modernization - Phase 4 Rail $0 $0 $597,030,000 $597,030,000

Description:

Des Plaines Yard and Forest Park terminal reconstruction

No Results Found

+ Pace Construct New Support Facilities Bus $0 $0 $0 $0

Description:

Add needed capacity for bus maintenance and storage

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ New I-55 Garage - Plainfield Support Facilities & Equipment Bus $0 $0

PROJECT DETAILS

Description:

Plainfield Garage - Completion of construction of a new 189,000 square foot bus storage and maintenance facility in Plainfield, housing up to 130 buses with 12 maintenance bays and administrative offices. Pace has executed an I.G.A. with Northern Builders and the village of Plainfield to construct the project.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$425,000
$0
$0
$425,000

PMO:

Total Project Budget^

$55,385,593

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Nov 2020

End Date

Apr 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Construction of the facility has been completed in September 2022. Pace received the occupancy permit and the facility operations as well as bus service started in October 2022. Pace added an additional phase to the project to include an electric bus charger and electric car chargers, as well as procurement of various furniture and equipment for the facility and offices. This last phase of the project has reached substantial completion in April 2023. This project is currently in close out.

Last Updated 06.22.2023

+ New Northwest Garage - Wheeling Support Facilities & Equipment Bus $0 $0

PROJECT DETAILS

Description:

Northwest Wheeling Garage - Completion of the renovation of a 430,000 square feet bus storage and maintenance facility in Wheeling that will replace Pace's Northwest Division garage in Des Plaines. This CNG fueling facility will house approximately 133 buses with 17 maintenance bays and administrative offices.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$81,129,563

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Dec 2020

End Date

Nov 2026

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Pace has entered into an Intergovernmental Agreement (IGA) with the Village of Wheeling. The improvements to Old Willow Road have been completed. The initial design has been finalized. The project is in the process of being re-scoped to add the electrification component. The design will be updated once Pace’s electrification study is completed to include the additional scope of work.

Last Updated 06.22.2023

+ River Division Expansion Support Facilities & Equipment Bus $0 $0

PROJECT DETAILS

Description:

This project is for architectural and engineering services that will provide pre-design services, geotechnical engineering, land surveys, traffic studies, existing facilities testing and evaluation and feasibility studies. It will also include design and construction administration, inspections and project oversight. Pace intends to expand and improve its existing River Division bus garage onto newly acquired property south of the existing garage. It will be designed to accommodate storage, servicing,

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$36,110,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Oct 2020

End Date

Jun 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Pace has entered into a contract for Architectural and Engineering services for pre-design and design services. The contractor completed the pre-design activities, and final pre-design report was submitted to Pace. The adjacent property acquisition has been completed. Pace is undertaking an electrification study that will inform the design changes needed to make this facility compatible with an electric bus fleet. The design activities are currently on hold pending the recommendations from this study. Pace will need to revise the initial 30% design to incorporate future electrification components before activities resume with the designer.

Last Updated 06.22.2023

+ South Campus Project - Markham Support Facilities & Equipment Bus $0 $0

PROJECT DETAILS

Description:

This project will provide for construction, project management oversight, project administration, and any associated equipment and services for the Pace South Campus project. New facilities will be built on a 22-acre site that is situated next door to Pace’s South Division (2107 W. 163rd Place) Garage in Markham, Illinois, which is already owned by Pace. The purpose of this project is to consolidate certain operational functions currently operating at each garage into one location.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$36,916,905

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Dec 2020

End Date

Oct 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The Notice to Proceed for construction has been issued in January 2022. Construction activities are in progress. The Acceptance Facility precast wall installation is ongoing. The office building work included roofing, under slab electrical installation, metal framing and HVAC layout.

Last Updated 06.22.2023

+ Pace Farebox System Bus $0 $0 $0 $0

Description:

Replace fareboxes that are over 20-years old

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Farebox System Replacement Support Facilities & Equipment Bus $0 $0

PROJECT DETAILS

Description:

Farebox System Replacement - Over 700 fareboxes on Pace fixed route buses will be replaced, with prior PAYGO funding of $7.5M from 2020 included.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$3,079,344
$0
$0
$3,079,344

PMO:

Total Project Budget^

$7,500,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Nov 2020

End Date

Mar 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Pace awarded their procurement for a new farebox system and production and delivery of the farebox equipment is ongoing. Farebox equipment continues to be installed and projected to be completed by Q1-2024.

Last Updated 06.22.2023

+ CTA Blue Line Forest Park Modernization - Phase 2 Rail $0 $0 $653,077,000 $653,077,000

Description:

Track improvements to address the most immediate critical track needs on the Forest Park Branch to enable its continued operation

No Results Found

+ CTA Radio System Upgrade Rail $0 $0 $35,000,000 $35,000,000

Description:

Replacement of obsolete radio system

No Results Found

+ CTA Mid-Life Bus Overhaul (4300 series) Bus $0 $0 $0 $0

Description:

Overhauls to maintain vehicles, ensure reliability and enable to perform through full useful life

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Mid-Life Bus Overhaul 4300 Series Rolling Stock Bus $0 $0

PROJECT DETAILS

Description:

Overhauls of the 4300 articulated buses to maintain vehicles, ensure reliability and enable to perform through full useful life

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$9,615,472
$0
$0
$9,615,472

PMO:

Total Project Budget^

$9,615,472

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jun 2022

End Date

Sep 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Production meetings with the contractor begun during this reporting period and continue to happen. The setup for the first two pilot buses is ongoing and expected to be received in the next reporting period.

Last Updated 06.22.2023

+ CTA Red Purple Modernization Rail $0 $0 $5,956,152,265 $5,956,152,265

Description:

Advancement of the Red and Purple Modernization (RPM) Program, the largest line rebuild and capital improvement project in CTA history

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Red/Purple Modernization - Phase 1 Modernization Rail $0 $0

PROJECT DETAILS

Description:

North Main Line - RPM The purpose of the Red and Purple Modernization (RPM) Program is to expand capacity to meet growing ridership demand; reduce travel times; improve access to job markets and destinations; better utilize existing transit infrastructure; bring the existing infrastructure to a state of good repair; and improve access to the system for patrons with disabilities.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$344,847,735
$0
$0
$344,847,735

PMO:

Total Project Budget^

$2,203,408,226

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Oct 2019

End Date

Jan 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Precast span erection was completed for the Lawrence to Bryn Mawr Modernization (LBMM) and the contractor continued welding rails along the track as well as prepping for installation of noise walls. Station house construction and steel erection for stairs and platform work at Bryn Mawr began this reporting period and are ongoing. The Clark relay house was set and traction power bracket was installed. The Winona signal racks are currently being installed in the relay room and testing will commence once the rack installation is completed.

Last Updated 06.22.2023

+ Pace Fixed Route Buses - Expansion Bus $0 $0 $83,889,000 $83,889,000

Description:

Buses for new services

No Results Found

+ CTA Red Line Improvements Rail $0 $0 $396,400,000 $396,400,000

Description:

Upgrades and State of Good Repair projects along the Red Line

No Results Found