Capital Projects

Regional Capital Program

Download Capital Dataset

 

Capital programming is a core function of the RTA. RTA and the Service Boards have worked to articulate as well as advance a capital strategy for transit projects in the Chicagoland region.

Priority Projects have been identified by the Service Boards. These priority projects were defined in the Invest in Transit  Regional Transit Strategic Plan and are updated on an annual basis. This page shows details about the funding for each priority project.

The 2023-2027 5-Year Regional Capital Program includes over 300 projects that are advancing many of these Priority Projects. The capital projects are shown in the table below, organized by Priority Project and can also be seen in a mapped form on the RTA Capital Projects Dashboard. Each project listing shows the amount of funding programmed in the 2023-2027 Regional Capital Program. Each listing also shows the core requirement(s) and strategic goals that each project helps to address, as defined in the region’s new performance-based capital allocation process.

Notably, the region has committed to dedicating 20% of programmed funds to projects that fulfill the core requirements of improving equity or achieving full accessibility for 2025 and beyond as a part of the new performance-based capital allocation process. 

The Service Boards have met and exceeded the 20% goal for the 2025, 2026 and 2027 budget years. Detailed analysis of the core requirements and strategic goals can be found in the Regional Transit Operating Budget and Capital Program

Read more about RTA’s capital programming activities here.

Project Management Oversite (PMO) data is provided for projects that are being actively monitored by the PMO group. Data included current activities, start and end date and budget and schedule status. The following page has a full list of active PMO projects.

 

Search More info

Filter

Core Requirement(s) More info

Strategic Goal More info

Agency Priority Project Mode 2023 Funding 2023-2027 Funding 10 Year Funding Neededsort descending 10 Year Unfunded Need
+ Pace Fixed Route Buses - Replacement Bus $0 $9,750,000 $79,300,000 $69,550,000

Description:

Replacement of buses reaching useful life

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Fixed Route CNG Buses Rolling Stock Bus $0 $0

PROJECT DETAILS

Description:

Replacement CNG buses - Pace plans to replace 115 diesel buses with 40' Compressed Natural Gas (CNG) buses including any associated equipment (cameras, destination signs, etc.) and services (Buy America audit and inspections) for the future Northwest Division garage in Wheeling, currently being designed as a CNG fueling facility.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$28,050,000
$0
$0
$28,050,000

Last Updated 12.16.2022

+ Fixed Route Coach Buses Rolling Stock Bus $0 $9,750,000

PROJECT DETAILS

Description:

Coach Buses - Pace plans to replace 13 40' diesel coach buses, including any associated equipment (cameras, destination signs, etc.) and services (Buy America audit and inspections) for the I-55 Bus on Shoulder service.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$9,750,000
$9,750,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$9,750,000
$9,750,000

Last Updated 12.16.2022

+ Purchase 30' Diesel Buses Rolling Stock Bus $0 $0

PROJECT DETAILS

Description:

This project is a new contract awarded in September 2019 for a new five‐year
indefinite delivery/indefinite quantity contract for 30’ low floor diesel buses. The
minimum quantity to be purchased under this contract is 67 buses and the total
number of buses procured will not exceed the maximum amount of 164.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$80,261,908

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Sep 2019

End Date

Sep 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

A total of 67 buses have been ordered to date. The first order consisted of 23 buses, all of which are in service. These were delayed due to the COVID-19 crisis. The second order consisted of 44 buses. All of the buses under the second order were received, with the final bus delivered in February 2023. The buses service the areas currently serviced by Fox Valley and Batavia.

Last Updated 06.22.2023

+ Purchase 40' Diesel Buses Rolling Stock Bus $0 $0

PROJECT DETAILS

Description:

Replacement diesel buses (40') - Pace plans to replace 78 diesel buses including any associated equipment (cameras, destination signs, etc.) and services (Buy America audit and inspections).

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$41,786,531

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jun 2019

End Date

Nov 2020

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Pace placed an order for the delivery of a total of 85 buses. To date, all 85 buses have been received and are in service. The buses are expected to service the routes currently serviced by West Division. This will be the final update on this project.

Last Updated 07.10.2021

+ Purchase 40' Low-Floor CNG Buses Rolling Stock Bus $0 $0

PROJECT DETAILS

Description:

Pace will purchase 40FT CNG Buses.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$75,896,625

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Mar 2022

End Date

Mar 2027

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Pace awarded a new contract for the purchase of additional vehicles in March 2022. The first order was a quantity of 47 CNG buses. The production of these vehicles has been put on hold during this reporting period. A portion of these vehicles will be utilized at the Northwest Wheeling Garage, which is an ongoing project. As Pace establishes a construction schedule for the Wheeling Garage, a production scheduled will be developed for the order of 47 buses.

Last Updated 06.22.2023

+ CTA Mid-Life Bus Overhaul (7900 series) Rail $0 $74,151,466 $80,488,850 $6,337,384

Description:

Overhauls to maintain vehicles, ensure reliability and enable to perform through full useful life

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Bus Overhaul - Mid-Life 450 Nova (7900 Series) Rolling Stock Bus $0 $74,151,466

PROJECT DETAILS

Description:

Funding will provide for the mid-life overhaul of the CTA Nova buses 7900 Series. Buses placed into service between 2014 and 2017 will receive a bus overhaul and will be returned to a state of good repair. This scheduled Mid-Life Bus Overhaul Program will allow for safe, effective operation of the buses throughout their standard estimated life of 15 years.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$74,151,466
$74,151,466
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$74,151,466
$74,151,466

Last Updated 05.18.2023

+ CTA Non-Revenue Vehicle Replacement Program System $2,494,359 $10,944,359 $81,741,905 $70,797,546

Description:

Replacement of vehicles needed for maintenance and operations support

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Equipment and Non-Revenue Vehicles Program Support Facilities & Equipment System $1,269,359 $7,269,359

PROJECT DETAILS

Description:

CTA plans to invest funds annually to fund the phased replacement of aged equipment and vehicles used by CTA maintenance groups that include Bus, Rail, Power & Way, and Facilities.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,269,359
$6,000,000
$7,269,359
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$1,269,359
$6,000,000
$7,269,359

Last Updated 05.18.2023

+ Non-Revenue Utility Vehicle Replacement Support Facilities & Equipment System $1,225,000 $3,675,000

PROJECT DETAILS

Description:

Heavy-Duty Vehicles to support routine infrastructure maintenance, emergency repairs, and recovery operations.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,225,000
$2,450,000
$3,675,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,225,000
$1,225,000
$2,450,000
$4,900,000

Last Updated 05.18.2023

+ Non-Revenue Vehicles - Diesel Locomotives Support Facilities & Equipment Rail $0 $0

PROJECT DETAILS

Description:

Equipment and Non-Revenue Vehicles (Diesel Locomotives): Funding will provide for the replacement of CTA's diesel locomotive snow fighters. The self-propelled locomotives with special attachments to remove snow and ice during severe winter weather conditions are able to operate and clear system track, so that CTA can safely power up the system to restore/provide service. When traction power is down, this equipment will also be used to move rolling stock to secure locations.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$3,333,095
$0
$0
$3,333,095

PMO:

Total Project Budget^

$22,731,013

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Aug 2020

End Date

May 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The structural design was approved by the CTA. The project is in full production mode and the contractor managed to start the first engine skid during this reporting period. The first locomotive is beginning the final assembly including all of the wiring, hoses, connection plates, and controls between various parts. CTA and the contractor are coordinating a site visit for when the load testing will be performed by the contractor. If the load test passes, the contractor will commission vehicle #1 and continue the assembly of the remaining vehicles.

Last Updated 06.22.2023

+ Pace Fixed Route Buses - Expansion Bus $0 $0 $83,889,000 $83,889,000

Description:

Buses for new services

No Results Found

+ Pace Pulse Infrastructure System $1,464,000 $21,031,500 $84,525,000 $63,493,500

Description:

Enhance Pulse service

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Pulse 95th Street Design and Construction Stations & Passenger Facilities Bus $1,464,000 $21,031,500

PROJECT DETAILS

Description:

Design and construction of stations of the Pulse 95th Rapid Transit Line. The project corridor is approximately 12.4 miles in length and runs east-west between the CTA Red Line 95th/Dan Ryan Station in Chicago and Moraine Valley Community College in Palos Hills primarily routed along 95th Street, as well as several other roadways in Bridgeview, Chicago Ridge, Hickory Hills, and Palos Hills.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,464,000
$15,654,000
$17,118,000
State
$0
$0
$3,913,500
$3,913,500
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$1,464,000
$19,567,500
$21,031,500

Last Updated 12.16.2022

+ Pace Associated Capital Maintenance Items Bus $0 $0 $89,600,000 $89,600,000

Description:

Capital costs associated with the maintenance of buses

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Engine/Transmission Retrofits & Maintenance Capital Rolling Stock Bus $0 $0

PROJECT DETAILS

Description:

Engine/Transmission Retrofits & Associated Capital - Replacement of engines and transmissions at a unit cost of $160,000 per bus and $8,000 per paratransit vehicle, and associated capital (radiator, pumps, alternator, filters, belts, compressors, coils, shafts, modules, clamps, heaters, turbochargers, etc.).

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$5,912,569
$0
$0
$5,912,569

Last Updated 12.16.2022

+ CTA Critical Needs at CTA Facilities Bus $0 $10,000,000 $118,533,935 $108,533,935

Description:

Roof and other upgrades to maintenance facilities

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Facilities Critical Needs Support Facilities & Equipment System $0 $10,000,000

PROJECT DETAILS

Description:

Address the most immediate critical needs at CTA facilities systemwide to enable their safe and reliable operation.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$10,000,000
$10,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$10,578,000
$0
$10,000,000
$20,578,000

Last Updated 12.16.2022

+ Facilities Critical Needs - Forest Glen Building Demolition Support Facilities & Equipment Bus $0 $0

PROJECT DETAILS

Description:

The purpose of this project is to eliminate building maintenance costs and security liabilities to CTA associated with the vacant buildings at the Forest Glen Bus Garage (located at 5353 W. Armstrong Avenue and 5601 N. Elston Avenue), as well as to provide additional capacity for bus parking at the Forest Glen Bus Garage. The project scope includes demolition of the buildings at 5353 W. Armstrong Avenue, 5601 N. Elston Avenue, and the existing salt shed (all currently owned by the CTA).

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$7,366,852

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Mar 2022

End Date

Feb 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Both of the vacant buildings have been demolished and the debris has been removed from the site. Fencing has been installed around the vacant lot. This project was significantly delayed due to the extensive environmental abatement process that was not initially anticipated. Final invoicing related to this process is outstanding. This is the final report on this project.

Last Updated 06.22.2023

+ Facilities Critical Needs - Kedzie Bus Garage Façade Support Facilities & Equipment Bus $0 $0

PROJECT DETAILS

Description:

The project will retain a DoR firm to complete a comprehensive assessment of the structure’s exterior envelope to develop remediation and/or replacement plans for concerns regarding the exterior brick veneer delaminating from the backing block. The work will include detailing for caulking, flashing, or other treatments to prevent future similar issues from occurring due to water infiltration. Construction will repair portions of the brick that have fallen from the structure and other repairs to prevent recurrence of the failure.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,875,813
$0
$0
$1,875,813

PMO:

Total Project Budget^

$6,596,514

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Oct 2021

End Date

Oct 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The design for the project has been completed. Notice to Proceed for construction was issued in February 2023. The general contractor is working on submittals and mobilizing for field work.

Last Updated 06.22.2023

+ CTA Information Technology Rail $8,661,703 $49,261,703 $124,100,000 $74,838,297

Description:

Improvement of business processes and systems

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Implement Security Projects - HLS Program Support Facilities & Equipment System $6,000,000 $30,000,000

PROJECT DETAILS

Description:

Implement Security Projects (HLS Program):

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$6,000,000
$24,000,000
$30,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$647,520
$6,000,000
$24,000,000
$30,647,520

Last Updated 12.16.2022

+ Information Technology - Bus Router Replacements (MP070's) Miscellaneous Bus $0 $4,200,000

PROJECT DETAILS

Description:

The purpose of this project is to perform a technological refresh of the bus routers to ensure bus communications network and data management is optimized. This refresh would be applied to the entire fleet of buses. Target 2024 to have hardware replaced and start refresh project. To provide the CTA transit buses entirely new communications router and management platform by transitioning to

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$4,200,000
$4,200,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$4,200,000
$4,200,000

Last Updated 12.16.2022

+ Information Technology - Hastus Upgrade Miscellaneous System $0 $1,000,000

PROJECT DETAILS

Description:

The purpose of this project is to upgrade to Hastus Version 2022 (or later) to ensure bus and rail scheduling utilizes the advanced scheduling tools Hastus provides to provide 24/7 transit service to CTA riders. This scheduling software utilizes customized rules based on CTA's union rules and also current transit industry trends. Target October 2022 to have hardware in place and start software upgrade project. The current Hastus contract with vendor GIRO requires CTA to begin the update project in Oct 2022 by providing a notice to proceed order in Q4 2022.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$1,000,000
$1,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$1,000,000
$1,000,000

Last Updated 12.16.2022

+ Information Technology - IVN3/IVN4 Replacement Miscellaneous Bus $861,703 $8,061,703

PROJECT DETAILS

Description:

The purpose of this project is to perform a technological refresh of the IVNs (Intelligent Vehicle Network) computer system on bus to ensure bus communications network and data management is optimized. This refresh would be applied to the entire fleet of buses. Target 2023 to have hardware replaced and start refresh project. To provide a technology refresh cycle all IVN (Intelligence Vehicle Network)computers on board the CTA Bus Fleet currently active in the Bus transportation field operations with new IVN5 models.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$7,200,000
$7,200,000
State
$0
$0
$0
$0
RTA
$0
$861,703
$0
$861,703
Service Board / Local
$0
$0
$0
$0
Total
$0
$861,703
$7,200,000
$8,061,703

Last Updated 06.22.2023

+ Information Technology - MMIMS Upgrade Miscellaneous System $0 $2,500,000

PROJECT DETAILS

Description:

The MMIS application is used for managing repairs and issuing parts to the CTA Bus and Rail fleet. The last upgrade of this application started in 2016 with target completion of 2018. By 2022, this version of the MMIS product will no longer be supported by Trapeze, the vendor of the MMIS application. This request is for the next anticipated major upgrade for this mission critical software.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$2,500,000
$2,500,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$2,500,000
$2,500,000

Last Updated 12.16.2022

+ Information Technology - Technology Upgrades Rail Engineering & Maintenance Rolling Stock Rail $100,000 $300,000

PROJECT DETAILS

Description:

Various Technology upgrades, such as: Replace RETS engineer computers with ones similar to Infrastructure Engineering at 567 be able to run CAD including using 3D modeling software (SolidWorks, CATIA, Polyworks). Needed for new car programs for which vendors increasingly are providing files in these formats. Improve Skokie server capacity for storage of larger files related to new car/overhaul programs, incident investigations.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$100,000
$200,000
$300,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$100,000
$200,000
$300,000

Last Updated 12.16.2022

+ Information Technology - TOPS Upgrade II Miscellaneous System $0 $1,500,000

PROJECT DETAILS

Description:

To upgrade TOPS to Version 2025 or higher. In order to be on the most recent software refresh and technological architecture the TOPS applications should be upgraded every 3-4 years to utilize the latest software algorithms and better means of doing business. The current contract with Trapeze calls for 2 different TOPS upgrade. This request is for the 2nd TOPS upgrade request. This project will be to upgrade the TOPS application, and its related hardware.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$1,500,000
$1,500,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$1,500,000
$1,500,000

Last Updated 12.16.2022

+ Rail Station Video Management Support Facilities & Equipment Rail $0 $0

PROJECT DETAILS

Description:

This project identifies needs for the complete upgrade and cyber security mitigation of CTA’s CCTV video management system across the rail system. Recent cyber security threat and vulnerability assessment (TVA) findings determined the existing video system has significant cyber vulnerabilities with the operating systems, is beyond useful life and is no longer supported. It is necessary to upgrade the video capture and storage infrastructure at over 200 rail facilities.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$4,913,000
$0
$0
$4,913,000

Last Updated 12.16.2022

+ Transit Cyber Security Support Facilities & Equipment System $0 $0

PROJECT DETAILS

Description:

This project calls for the implementation of a comprehensive Transit Cyber Security and Risk Mitigation Project within the Chicago Transit Authority (CTA). Project will include the upgrade, modernization, and hardening of CTA’s core firewall and network infrastructure, adding cyber security tools and services to identify, protect, detect, respond, and recover from and against cyber threats and vulnerabilities.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$3,912,000
$0
$0
$3,912,000

Last Updated 12.16.2022

+ Upgrade Computer Systems - (TOPS, Enterprise Systems) Miscellaneous System $0 $0

PROJECT DETAILS

Description:

To upgrade TOPS to Version 2025 or higher. In order to be on the most recent software refresh and technological architecture the TOPS applications should be upgraded every 3-4 years to utilize the latest software algorithms and better means of doing business. The current contract with Trapeze calls for 2 different TOPS upgrade. This request is for the 2nd TOPS upgrade request. This project will be to upgrade the TOPS application, and its related hardware.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,700,000
$0
$0
$1,700,000

Last Updated 12.16.2022

+ Upgrade Office Computer Systems Miscellaneous System $1,700,000 $1,700,000

PROJECT DETAILS

Description:

Funding will provide for the hardware needed for any business-requested upgrades to major IT applications, which may include but not be limited to MMIS, Filemaker Pro, Hyperion, and QuickTrack. This project will also provide for the continued upgrade/replacement of desktop computers, printers servers, software, and associated peripherals.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,700,000
$0
$1,700,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$1,700,000
$0
$1,700,000

Last Updated 12.16.2022

+ CTA Blue Line Forest Park Modernization - Phase 1 Rail $86,213,954 $86,213,954 $131,245,158 $45,031,204

Description:

Track improvements to address the most immediate critical track needs on the Forest Park Branch to enable its continued operation

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Forest Park: Phase 1 - Racine Station and Morgan Substation & Hermitage Traction Power Improvements Stations & Passenger Facilities Rail $67,471,237 $67,471,237

PROJECT DETAILS

Description:

The CTA's Forest Park Blue Line Upgrades Project is the first of four phases of the Forest Park Branch. This project will provide for new trackwork from Halsted to IMD, an accessible station at Racine, advanced utility work, and a new substation and traction power equipment upgrades at Hermitage. This work will enhance service quality via speed, reliability, and comfort, and improve operational efficiency on the Forest Park Branch of CTA's rapid transit Blue Line service.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$62,780,000
$0
$62,780,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$4,691,237
$0
$4,691,237
Total
$0
$67,471,237
$0
$67,471,237

PMO:

Total Project Budget^

$97,080,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jul 2021

End Date

Oct 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The design for this project has been completed. A Notice to Proceed for construction has been issued in May 2023. The contractor is currently working on the required submittals.

Last Updated 06.22.2023

+ Forest Park: Phase 1 - Advance Utility Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

The CTA's Forest Park Blue Line Upgrades Project is the first of four phases of the Forest Park Branch.
This project will provide for new trackwork from Halsted to IMD, an accessible station at Racine,
advanced utility work, and a new substation and traction power equipment upgrades at Hermitage. This
work will enhance service quality via speed, reliability, and comfort, and improve operational efficiency on
the Forest Park Branch of CTA's rapid transit Blue Line service.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$3,396,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Aug 2021

End Date

Oct 2021

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The contractors for all four surveys completed their work during this reporting period and two are in final comments. Invoicing continues and all four contracts are considered to be in financial closeout. This will be the last update on this project.

Last Updated 01.10.2022

+ Forest Park: Phase 1 - Trackwork Halsted to IMD Track & Structure Rail $18,742,717 $18,742,717

PROJECT DETAILS

Description:

The CTA's Forest Park Blue Line Upgrades Project is the first of four phases of the Forest Park Branch. This project will provide for new trackwork from Halsted to Illinois Medical District (IMD), an accessible station at Racine, advanced utility work, and a new substation and traction power equipment upgrades at Hermitage. This work will enhance service quality via speed, reliability, and comfort, and improve operational efficiency on the Forest Park Branch of CTA's rapid transit Blue Line service.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$13,749,613
$0
$13,749,613
RTA
$0
$0
$0
$0
Service Board / Local
$0
$4,993,104
$0
$4,993,104
Total
$24,766,842
$18,742,717
$0
$43,509,559

PMO:

Total Project Budget^

$158,423,800

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jun 2021

End Date

Mar 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The design for this project has been completed. The Notice to Proceed for construction was issued in March 2023. The contractor is working on submittals and getting ready to mobilize for field work.

Last Updated 06.22.2023

+ CTA Replacement Bus Purchase (4300 series) - Electric Buses Rail $0 $0 $140,000,000 $140,000,000

Description:

Ongoing need to replace buses as they age

No Results Found