Pace Local Transit Planning For Hoffman Estates, Waukegan, and Woodridge (Barrington Road Station Final Report)
This project funded technical assistance to Pace to enable them to conduct the following studies: The Green Bay Road Flexible Transportation Study in Lake County; the Barrington Road / I-90 Hoffman Estates Circulator and Land Use Study; and the Woodridge Park and Ride Transportation Plan. The following document focused on Barrington Road.
4003_Pace_BarringtonRoad_TransitImprovementPlan_2016
File
File was too large or unavailable for preview.
Field | Value |
---|---|
mimetype | application/pdf |
filesize | 58.59 MB |
timestamp | Dec 16, 2020 |