Pace Local Transit Planning For Hoffman Estates, Waukegan, and Woodridge (Woodridge Park and Ride Final Report)
This project funded technical assistance to Pace to enable them to conduct the following studies: The Green Bay Road Flexible Transportation Study in Lake County; the Barrington Road / I-90 Hoffman Estates Circulator and Land Use Study; and the Woodridge Park and Ride Transportation Plan. The following document focused on the Woodridge Park and Ride.
4004_Pace_Woodridge_TransitImprovementPlan_2016
File
File was too large or unavailable for preview.
Field | Value |
---|---|
mimetype | application/pdf |
filesize | 4.85 MB |
timestamp | Dec 16, 2020 |