Capital Projects

Regional Capital Program

Download Capital Dataset

Capital programming is a core function of the RTA. RTA and the Service Boards have worked to articulate as well as advance a capital strategy for transit projects in the Chicagoland region.

Priority Projects have been identified by the Service Boards. These priority projects were defined in the Invest in Transit  Regional Transit Strategic Plan and are updated on an annual basis. This page shows details about the funding for each priority project.

The 2024-2028 5-Year Regional Capital Program includes over 250 projects that are advancing many of these Priority Projects. The capital projects are shown in the table below, organized by Priority Project and can also be seen in a mapped form on the RTA Capital Projects Dashboard. Each project listing shows the amount of funding programmed in the 2024-2028 Regional Capital Program. Beginning with the 2024-2028 Capital Program, projects are evaluated based on 15 measure which were identified in the new Regional Transit Strategic Plan, Transit is the Answer. All projects in the 2024-2028 program show the detailed evaluations in this site.

The metrics include evaluations of Equity and Accessibility which are used in the performance-based allocation process. The region has committed to dedicating 20% of programmed funds to projects that fulfill the regional goals of improving equity and accessibility for 2025 and beyond as a part of the new performance-based capital allocation process

The Service Boards have met and exceeded the 20% goal for the 2025-2028 budget years.

Detailed analysis of the capital evaluation metrics is included in the Regional Transit Operating Budget and Capital Program

Read more about RTA’s capital programming activities here.

Project Management Oversite (PMO) data is provided for projects that are being actively monitored by the PMO group. Data included current activities, start and end date and budget and schedule status. The following page has a full list of active PMO projects.

 

Search More info

Filter

Core Requirement(s) More info

Strategic Goal More info

Agencysort descending Priority Project Mode 2023 Funding 2023-2027 Funding 10 Year Funding Needed 10 Year Unfunded Need
+ CTA Red Line Extension Rail $154,480,519 $339,480,519 $3,541,709,184 $3,202,228,665

Description:

Extension of the Red Line from 95th Street to 130th Street

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Red Line Extension - Planning, Preliminary Engineering Extension Rail $154,480,519 $339,480,519

PROJECT DETAILS

Description:

Red Line Extension Planning, Preliminary Engineering
Funds will provide for planning, program management, and preliminary engineering services for the anticipated extension of the south leg of the Red Line. Funding will allow for the CTA to continue project work through the Project Development phase where the Final Environmental Impact Statement (EIS) and Preliminary Engineering for the project will be completed.
CIP also provides the 30% non-Capital Improvement Grant match ($310M) commitment needed to successfully complete Project Development.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$30,000,000
$30,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$154,480,519
$155,000,000
$309,480,519
Total
$60,240,816
$154,480,519
$185,000,000
$399,721,335

Last Updated 12.16.2022

+ CTA BRT/Bus Slow Zone Removal/ TSP/Dedicated Lane projects System $15,200,000 $15,200,000 $231,240,000 $216,040,000

Description:

Targeted street and traffic signal improvements to increase bus speeds

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Bus Slow Zones Elimination Program Miscellaneous Bus $15,200,000 $15,200,000

PROJECT DETAILS

Description:

This is a joint partnership with CDOT where CTA and CDOT will implement a coordinated program of bus priority treatments and targeted solutions for specific problem areas, in order to improve speed and reliability on major bus corridors. Project funds will cover final design and construction for all six routes.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$15,200,000
$0
$15,200,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$15,200,000
$0
$15,200,000

Last Updated 12.16.2022

+ CTA Replacement Bus Purchase (4300 series) - Electric Buses Rail $0 $0 $140,000,000 $140,000,000

Description:

Ongoing need to replace buses as they age

No Results Found

+ CTA Administration - CTA System $8,339,356 $42,399,214 $55,000,000 $12,600,786

Description:

CTA's administrative projects

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Office Building Principle and Interest Miscellaneous System $6,189,175 $30,937,288

PROJECT DETAILS

Description:

The scope of this project will provide for capitalized lease payments for the new administration building, and improvements and upgrades to existing facilities and associated elements throughout the system.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$6,189,175
$24,748,113
$30,937,288
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$6,186,456
$6,189,175
$24,748,113
$37,123,744

Last Updated 12.16.2022

+ Support Services Contingencies and Administration System $2,150,181 $11,461,926

PROJECT DETAILS

Description:

Funding will provide for Project Administration for the program of projects.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$2,150,181
$9,311,745
$11,461,926
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$5,387,500
$2,150,181
$9,311,745
$16,849,426

Last Updated 05.18.2023

+ CTA Tactical Traction Power Improvements (Systemwide) Rail $0 $0 $155,739,098 $155,739,098

Description:

Traction power substation, third rail replacement and SCADA upgrades

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Systemwide Tactical Traction Power Upgrades (Equipment/Cable/Enclosures) Electrical, Signal & Communications Rail $0 $0

PROJECT DETAILS

Description:

Tactical Traction Power (Equipment/Cable/Enclosures) -The purpose of this project is to implement traction power system improvements that will enable the CTA to continue to meet existing traction power needs, increase traction power capacity to meet future demand, and address state of good repair by repairing or replacing worn or obsolete equipment.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$10,864,902
$0
$0
$10,864,902

PMO:

Total Project Budget^

$15,166,629

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jan 2020

End Date

Jul 2021

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The contractor made significant headway during this reporting period and was able to reach substantial completion in July of this year. The contractor was able to finish the final walkthrough inspection and completed all punchlist items and is in contract closeout. This will be the final update on this project.

Last Updated 01.10.2022

+ CTA Blue Line (O'Hare) Traction Power Capacity & Track Improvements Rail $0 $0 $217,940,463 $217,940,463

Description:

Upgrades and State of Good Repair projects along the O'Hare Branch of the Blue Line

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Blue Line O'Hare Branch - Special Trackwork Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

Funds provide for the replacement of stock rails, switch points, frogs, switch ties, and plates on the O’Hare Line that are no longer in a state of good repair and require concentrated maintenance by CTA forces to ensure service. The component replacement will take place between the Jefferson Park interlocking and the O’Hare terminal.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$2,013,674
$0
$0
$2,013,674

Last Updated 12.16.2022

+ Blue Line O'Hare Branch Traction Power Improvements Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

Blue Line O'Hare Branch Traction Power Improvements GTT - Project will include targeted track repairs to remove existing slow zones on the Congress Branch of the Blue Line. CTA has identified traction power voltage drop issues along the Blue Line. Scope of work will include but not limited to the following elements: New infill substations, infill wayside energy storage systems, infill tie houses, third rail replacement, addition of auxiliary negative rail; work will be performed by an outside contractor.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$12,405,159
$0
$0
$12,405,159

PMO:

Total Project Budget^

$207,100,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

May 2018

End Date

Mar 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The contractor completed installation and testing of wayside signal equipment and all cutovers along the specific portion of the blue line. The project is considered substantially complete with the contractor performing punch list items. Final invoices remain and this will be the final update on this project.

Last Updated 06.22.2023

+ Blue Line Traction Power - Barry, Damen and Canal Electrical, Signal & Communications Rail $0 $0

PROJECT DETAILS

Description:

Construct a tie house (at the intersection of Milwaukee/Canal/Lake Street) and two new substations (at
Barry/Kimball intersection and Damen/Milwaukee intersection) to support traction power needs on the
Blue Line. These assets will support increasing ridership demands as well as the power needed to
support 5000 and 7000 series rail cars. The location of the tie house and substations were determined
by the Blue Line Load Flow study, which identified areas that were likely to experience traction power
issues.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$2,200,191
$0
$0
$2,200,191

PMO:

Total Project Budget^

$122,417,171

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Oct 2021

End Date

Jan 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Construction is ongoing at Canal, Damen and Haymarket, with majority of construction forces working at Damen Substation on structural steel installation and electrical work. Substation equipment factory testing is ongoing. A change order to add the scope for the Kimball Subway Belmont crossover has been authorized. Work on the Belmont-Kimball crossover is ongoing during the weekends. There are project delays associated with underground obstructions discovered at the Damen location during micropile installations. A workaround has been developed and a new permitting application process is ongoing.

Last Updated 06.22.2023

+ Old Mannheim Replacement Foot walk Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

Restore footwalk at Old Manheim on the O'Hare Line.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$250,000

Last Updated 12.16.2022

+ Traction Power Upgrades - Kedvale, Edmunds & Sacramento Substations Electrical, Signal & Communications Rail $0 $0

PROJECT DETAILS

Description:

This project will Provide for AC breaker replacement at Kedvale, Edmunds and Sacramento substations. This will also include the replacement of oil (non‐PCB) transformer and rectifiers along with roof and doors replacement at the Kedvale and Sacramento substations.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$12,030,427

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Apr 2022

End Date

Jan 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The contractor was able to install the transformers, rectifiers, as well as roof and door replacements since the last reporting period. The project reachedsubstantial completion in January 2023 and punchlist items were completed. Final invoices remain. This will be the final update on this project.

Last Updated 06.22.2023

+ CTA Bond Repayment, Interest Cost & Finance Cost System $197,095,845 $1,011,656,756 $1,874,473,580 $862,816,824

Description:

Support CTA Debt

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ CTA Bond Repayment - Principal/Interest Miscellaneous System $197,095,845 $1,011,656,756

PROJECT DETAILS

Description:

Bond Repayment, Interest Cost, & Finance Cost: Provide for debt service and the cost of issuance of bonds, notes and other indebtedness incurred by the CTA.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$197,095,845
$814,560,911
$1,011,656,756
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$317,940,808
$197,095,845
$814,560,911
$1,329,597,564

Last Updated 12.16.2022

+ CTA Signal Replacement (Systemwide) Rail $0 $0 $619,339,000 $619,339,000

Description:

Replacement of outdated signal systems systemwide

No Results Found

+ Metra 75th Street Corridor Rail $0 $0 $1,568,175,000 $1,568,175,000

Description:

Reconfigure track shared by Metra, Amtrak, and freight trains

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ CREATE - P2 Rock Island District Connection Track & Structure Rail $0 $0

PROJECT DETAILS

Description:

This project will provide engineering for the 75th Street Corridor Improvement Project (CIP) that will relieve rail congestion by separating freight and passenger rail lines. Bottlenecks will be eliminated, and train idling will be reduced.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$23,000,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Aug 2020

End Date

Dec 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

This project is currently in design. The 60% design has been completed. Design development activities continue to progress to 90% design. Procurement process for Rightof- Way acquisition is ongoing.

Last Updated 06.22.2023

+ Metra A-2 Interlocking Replacement Rail $0 $0 $787,500,000 $787,500,000

Description:

Separate tracks at busiest switching location on Metra system

No Results Found