Systemwide Tactical Traction Power Upgrades (Equipment/Cable/Enclosures)
This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.
If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.
Each capital project is measured on 15 evaluation metrics to better understand its impact on the region. Learn more about the metrics and see a legend for all measures here.
Click the circled (i) information button to read a definition of each metric and hover over the image to see more about each measure.
Project programmed before 2024; Not evaluated by these metrics.
Project Description
Tactical Traction Power (Equipment/Cable/Enclosures) -The purpose of this project is to implement traction power system improvements that will enable the CTA to continue to meet existing traction power needs, increase traction power capacity to meet future demand, and address state of good repair by repairing or replacing worn or obsolete equipment.