CREATE - P2 Rock Island District Connection

This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.

If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.

Project programmed before 2024; Not evaluated by these metrics.

Project Description

This project will provide engineering for the 75th Street Corridor Improvement Project (CIP) that will relieve rail congestion by separating freight and passenger rail lines. Bottlenecks will be eliminated, and train idling will be reduced.