Replace Bridges - 18th to 55th - RID
This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.
If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.
Each capital project is measured on 15 evaluation metrics to better understand its impact on the region. Learn more about the metrics and see a legend for all measures here.
Click the circled (i) information button to read a definition of each metric and hover over the image to see more about each measure.
Project programmed before 2024; Not evaluated by these metrics.
Project Description
Phase 1 and 2 design and construction are complete. The Phase 3 design task wasissued an NTP in August 2018. The Phase 3 design was completed in July 2019. ThePhase 3 construction contract and construction management contract were bothawarded in September 2020. Construction started with site work in March 2021and is ongoing. Current activities are related to obtaining permits. The estimatedproject completion date for construction is December 2021 to allow enough timefor phase 3 construction.