Bus Overhaul - Mid-Life 450 Nova (7900 Series)

This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.

If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.

The degree to which a project improves regional access to the region’s key destinations. Including jobs, retail, healthcare, recreation, and education.

The project improvements to existing assets to make them partially or fully accessible. Including station/stop and area improvements, vehicle accessibility, and accessible communications.

The project impact to ratings from the FTA Transit Economic Requirements Model (TERM).

The project’s minor or major benefits to riders and what proportion of the agency’s riders will benefit from it.

The project impact on overall capacity, reflecting current and planned levels of utilization.

The project impact on reductions or offsets to greenhouse gas (GHG) emissions generated from transit operations.

Project impacts on land use and development, construction, and long-term jobs.

The distribution of project benefits to location(s) identified under the USDOT Justice40 Program.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

The project impact on operating costs.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

Project impact on maintenance or improvement of service speed and reliability, considering both direct and indirect impacts.

If required, whether or not the project complies with federal, state, local, or other regulatory mandates.

The project impact to climate benefits, such as a reduction in emissions, generated from mode shift to transit and away from private auto-use.

The Project impact to average vehicle ages, compared with Service board benchmarks to prioritize replacing vehicles that are beyond their useful life.

Evaluation Metric Measure
Access to Key Destinations ? Maintains Access to Key Destinations
Accessibility Improvement(s) ? Is needed to maintain current levels of accessibility
Asset Condition (FTA TERM Rating) ? Project does not have an asset rating
Benefit to Riders ? Moderate benefit to riders
Capacity Benefit and Need ? Project maintains/returns system to original capacity
Climate Agency Operating Impacts ? No reduction in emission
Economic Impact ? No economic impact
Equity Based on Residential Geography ? Project is not location specific or benefits entire service area
Impact on Customer and Employee Safety ? Project maintains current safety levels
Impact on Operating Cost ? Decrease
Impact on System Security ? Project does not impact security
Impact to Service Speed/Reliability ? Needed to maintain current speek/reliability
Regulatory Requirements ? Yes
Ridership/Mode Shift Impacts ? Maintains assets necessary for transit ridership
Vehicle Useful Life ? Not exceeding useful life

Project Description

Funding will provide for the mid-life overhaul of the CTA Nova buses 7900 Series. Buses placed into service between 2014 and 2017 will receive a bus overhaul and will be returned to a state of good repair. This scheduled Mid-Life Bus Overhaul Program will allow for safe, effective operation of the buses throughout their standard estimated life of 15 years.Major components, which are a part of the overhaul, include items such as engines, transmissions, electronics (including cameras, GPS, destination signs, voice announcements, and passenger counters), HAVC, cooling and suspension systems, doors, wheel chair ramps, driver seats, interior lighting, and other components as needed.