Rock Island Intercity Improvements (RI3)

This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.

If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.

The degree to which a project improves regional access to the region’s key destinations. Including jobs, retail, healthcare, recreation, and education.

The project improvements to existing assets to make them partially or fully accessible. Including station/stop and area improvements, vehicle accessibility, and accessible communications.

The project impact to ratings from the FTA Transit Economic Requirements Model (TERM).

The project’s minor or major benefits to riders and what proportion of the agency’s riders will benefit from it.

The project impact on overall capacity, reflecting current and planned levels of utilization.

The project impact on reductions or offsets to greenhouse gas (GHG) emissions generated from transit operations.

Project impacts on land use and development, construction, and long-term jobs.

The distribution of project benefits to location(s) identified under the USDOT Justice40 Program.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

The project impact on operating costs.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

Project impact on maintenance or improvement of service speed and reliability, considering both direct and indirect impacts.

If required, whether or not the project complies with federal, state, local, or other regulatory mandates.

The project impact to climate benefits, such as a reduction in emissions, generated from mode shift to transit and away from private auto-use.

The Project impact to average vehicle ages, compared with Service board benchmarks to prioritize replacing vehicles that are beyond their useful life.

Evaluation Metric Measure
Access to Key Destinations ? Significantly improves Access to Key Destinations
Accessibility Improvement(s) ? Project is not related to accessibility
Asset Condition (FTA TERM Rating) ? Asset(s) rated above 3
Benefit to Riders ? Significant benefit to riders
Capacity Benefit and Need ? Project increases capacity of transit operations near capacity
Climate Agency Operating Impacts ? Supports moderate reduction in emissions
Economic Impact ? Large impact on economic development
Equity Based on Residential Geography ? Scores 6-8 in Justice40 metric 'Sum of Disadvantage Indicators'
Impact on Customer and Employee Safety ? Project directly provides safety benefit/improvement
Impact on Operating Cost ? Increase
Impact on System Security ? Project implements new security protection and/or prevention
Impact to Service Speed/Reliability ? Significantly improves speed/reliability
Regulatory Requirements ? No
Ridership/Mode Shift Impacts ? Significantly improves transit ridership
Vehicle Useful Life ? Asset is not a vehicle with a useful life

Project Description

This project will establish a new 3rd main line track on the Rock Island (RI) Line and various improvements between the LaSalle Street and Joliet terminals. The new 3rd main line track is anticipated to extend from the new 16th Interlocking at MP 1.0 to the new CREATE P2 Interlocking at CP 74th. The project may include but is not limited to new crossovers, the rehabilitation of bridges, reconstruction of retaining walls, modifications to existing stations, and other improvements to facilitate train movements onto the new 3rd main line track. This project may also include the extension of the 49th Street Yard, new yard facilities, and other improvements to increase the capacity of operations at the 49th Street Yard. Additional improvements include signaling and grade crossing improvements from Gresham to Joliet as well as an improved Joliet station platform for Metra and Amtrak use.