Bridge Replacement Program

This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.

If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.

The degree to which a project improves regional access to the region’s key destinations. Including jobs, retail, healthcare, recreation, and education.

The project improvements to existing assets to make them partially or fully accessible. Including station/stop and area improvements, vehicle accessibility, and accessible communications.

The project impact to ratings from the FTA Transit Economic Requirements Model (TERM).

The project’s minor or major benefits to riders and what proportion of the agency’s riders will benefit from it.

The project impact on overall capacity, reflecting current and planned levels of utilization.

The project impact on reductions or offsets to greenhouse gas (GHG) emissions generated from transit operations.

Project impacts on land use and development, construction, and long-term jobs.

The distribution of project benefits to location(s) identified under the USDOT Justice40 Program.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

The project impact on operating costs.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

Project impact on maintenance or improvement of service speed and reliability, considering both direct and indirect impacts.

If required, whether or not the project complies with federal, state, local, or other regulatory mandates.

The project impact to climate benefits, such as a reduction in emissions, generated from mode shift to transit and away from private auto-use.

The Project impact to average vehicle ages, compared with Service board benchmarks to prioritize replacing vehicles that are beyond their useful life.

Evaluation Metric Measure
Access to Key Destinations ? Maintains Access to Key Destinations
Accessibility Improvement(s) ? Project is not related to accessibility
Asset Condition (FTA TERM Rating) ? Asset(s) rated below 2
Benefit to Riders ? Moderate benefit to riders
Capacity Benefit and Need ? Project maintains/returns system to original capacity
Climate Agency Operating Impacts ? Project does not effect GHG emissions
Economic Impact ? Large impact on economic development
Equity Based on Residential Geography ? Project is not location specific or benefits entire service area
Impact on Customer and Employee Safety ? Project directly provides safety benefit/improvement
Impact on Operating Cost ? Decrease
Impact on System Security ? Project does not impact security
Impact to Service Speed/Reliability ? Moderately improves current speed/reliability
Regulatory Requirements ? Yes
Ridership/Mode Shift Impacts ? Maintains assets necessary for transit ridership
Vehicle Useful Life ? Asset is not a vehicle with a useful life

Project Description

This on-going project will fund the preliminary engineering phase and environmental analyses as required by the National Environmental Policy Act (NEPA) for up to five proposed bridge replacement projects per year. Projects that advance to the final design and construction phases will be funded by new, location-specific project numbers as funding becomes available. Specific bridge replacement project locations are to be determined based on priority needs, annual bridge condition inspections, bridge sufficiency ratings, and the potential for bundling multiple bridge replacement projects in one construction contract procurement. The bridge replacement program is a multi-year project. Final design and construction funds have not been identified for 2024 activities that will be funded by this project.