HazMat Storage Systems

This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.

If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.

Each capital project is measured on 15 evaluation metrics to better understand its impact on the region. Learn more about the metrics and see a legend for all measures here.

Click the circled (i) information button to read a definition of each metric and hover over the image to see more about each measure.

The degree to which a project improves regional access to the region’s key destinations. Including jobs, retail, healthcare, recreation, and education.

The project improvements to existing assets to make them partially or fully accessible. Including station/stop and area improvements, vehicle accessibility, and accessible communications.

The project impact to ratings from the FTA Transit Economic Requirements Model (TERM).

The project’s minor or major benefits to riders and what proportion of the agency’s riders will benefit from it.

The project impact on overall capacity, reflecting current and planned levels of utilization.

The project impact on reductions or offsets to greenhouse gas (GHG) emissions generated from transit operations.

Project impacts on land use and development, construction, and long-term jobs.

The distribution of project benefits to location(s) identified under the USDOT Justice40 Program.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

The project impact on operating costs.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

Project impact on maintenance or improvement of service speed and reliability, considering both direct and indirect impacts.

If required, whether or not the project complies with federal, state, local, or other regulatory mandates.

The project impact to climate benefits, such as a reduction in emissions, generated from mode shift to transit and away from private auto-use.

The project impact to average vehicle ages, compared with Service board benchmarks to prioritize replacing vehicles that are beyond their useful life.

Evaluation Metric Measure
Access to Key Destinations i
Not applicable symbol

Does not impact Access to Key Destinations

Click here to see more information on this capital metric and its measures.

Accessibility Improvement(s) i
Not applicable symbol

Project is not related to accessibility

Click here to see more information on this capital metric and its measures.

Asset Condition (FTA TERM Rating) i
Not applicable symbol

Project does not have an asset rating

Click here to see more information on this capital metric and its measures.

Benefit to Riders i
Not applicable symbol

Project does not impact riders

Click here to see more information on this capital metric and its measures.

Capacity Benefit and Need i
Not applicable symbol

Not related to capacity of transit operations or facilities

Click here to see more information on this capital metric and its measures.

Climate Agency Operating Impacts i
Not applicable symbol

Project does not effect GHG emissions

Click here to see more information on this capital metric and its measures.

Economic Impact i
Not applicable symbol

No economic impact

Click here to see more information on this capital metric and its measures.

Equity Based on Residential Geography i
Not applicable symbol

Project is not location specific or benefits entire service area

Click here to see more information on this capital metric and its measures.

Impact on Customer and Employee Safety i
Two green up arrows

Project directly provides safety benefit/improvement

Click here to see more information on this capital metric and its measures.

Impact on Operating Cost i
Not applicable symbol

No effect on operating cost or cost change undetermined

Click here to see more information on this capital metric and its measures.

Impact on System Security i
Not applicable symbol

Project does not impact security

Click here to see more information on this capital metric and its measures.

Impact to Service Speed/Reliability i
Not applicable symbol

No impact on service speed/reliability

Click here to see more information on this capital metric and its measures.

Regulatory Requirements i
Black x mark

No regulatory requirements met for this project

Click here to see more information on this capital metric and its measures.

Ridership/Mode Shift Impacts i
Not applicable symbol

Project has no impact on transit ridership

Click here to see more information on this capital metric and its measures.

Vehicle Useful Life i
Not applicable symbol

Asset is not a vehicle with a useful life

Click here to see more information on this capital metric and its measures.

Project Description

Hazardous chemicals and materials have special requirements for handling and storage. This project will be utilized to expand storage capacities where necessary and replace storage containers in poor condition. Project activities include but are not limited to adding storage cabinets or other containers system-wide for the storage of hazardous chemicals including flammable materials, caustics, compressed gasses, hazardous wastes, batteries, or other similar materials. Expansion of facilities and shops as well as revised workplace safety policies and regulations will be funded under this project as needed. This is a multi-year, multi-phase project.