2025 - Elevated Track and Structure Maintenance Systemwide

This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.

If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.

Each capital project is measured on 15 evaluation metrics to better understand its impact on the region. Learn more about the metrics and see a legend for all measures here.

Click the circled (i) information button to read a definition of each metric and hover over the image to see more about each measure.

The degree to which a project improves regional access to the region’s key destinations. Including jobs, retail, healthcare, recreation, and education.

The project improvements to existing assets to make them partially or fully accessible. Including station/stop and area improvements, vehicle accessibility, and accessible communications.

The project impact to ratings from the FTA Transit Economic Requirements Model (TERM).

The project’s minor or major benefits to riders and what proportion of the agency’s riders will benefit from it.

The project impact on overall capacity, reflecting current and planned levels of utilization.

The project impact on reductions or offsets to greenhouse gas (GHG) emissions generated from transit operations.

Project impacts on land use and development, construction, and long-term jobs.

The distribution of project benefits to location(s) identified under the USDOT Justice40 Program.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

The project impact on operating costs.

The project impact to maintenance or improvement of exposure to risk for riders/employees and the project impact to security enhancement.

Project impact on maintenance or improvement of service speed and reliability, considering both direct and indirect impacts.

If required, whether or not the project complies with federal, state, local, or other regulatory mandates.

The project impact to climate benefits, such as a reduction in emissions, generated from mode shift to transit and away from private auto-use.

The project impact to average vehicle ages, compared with Service board benchmarks to prioritize replacing vehicles that are beyond their useful life.

Evaluation Metric Measure
Access to Key Destinations i
Black line with arrows on each end

Maintains Access to Key Destinations

Click here to see more information on this capital metric and its measures.

Accessibility Improvement(s) i
Not applicable symbol

Project is not related to accessibility

Click here to see more information on this capital metric and its measures.

Asset Condition (FTA TERM Rating) i
Red gear

Asset(s) rated below 2

Click here to see more information on this capital metric and its measures.

Benefit to Riders i
Black line with arrows on each end

Helps to maintain current benefits to riders

Click here to see more information on this capital metric and its measures.

Capacity Benefit and Need i
Black line with arrows on each end

Project maintains/returns system to original capacity

Click here to see more information on this capital metric and its measures.

Climate Agency Operating Impacts i
Not applicable symbol

Project does not effect GHG emissions

Click here to see more information on this capital metric and its measures.

Economic Impact i
Not applicable symbol

No economic impact

Click here to see more information on this capital metric and its measures.

Equity Based on Residential Geography i
Not applicable symbol

Project is not location specific or benefits entire service area

Click here to see more information on this capital metric and its measures.

Impact on Customer and Employee Safety i
Black line with arrows on each end

Project maintains current safety levels

Click here to see more information on this capital metric and its measures.

Impact on Operating Cost i
One green down arrow

Decreases operating cost

Click here to see more information on this capital metric and its measures.

Impact on System Security i
Not applicable symbol

Project does not impact security

Click here to see more information on this capital metric and its measures.

Impact to Service Speed/Reliability i
Black line with arrows on each end

Needed to maintain current speek/reliability

Click here to see more information on this capital metric and its measures.

Regulatory Requirements i
Black x mark

No regulatory requirements met for this project

Click here to see more information on this capital metric and its measures.

Ridership/Mode Shift Impacts i
Black line with arrows on each end

Maintains assets necessary for transit ridership

Click here to see more information on this capital metric and its measures.

Vehicle Useful Life i
Not applicable symbol

Asset is not a vehicle with a useful life

Click here to see more information on this capital metric and its measures.

Project Description

Funding will be targeted at preventive maintenance projects for various Infrastructure units such as Track, Structure and Power. When certain maintenance tasks are needed to repair or replace asset components in order to maintain the working life of rail system, specific component campaign work is conducted. Capital maintenance work is targeted at the following areas: Elevated Track and Structure - repair/rehabilitate track and structure elements in order to eliminate slow zones and upgrade the right-of-way along the elevated structure throughout the rail system. Traction Power Substations - program that repairs and upgrades equipment at various traction power substations currently in service. Tactical upgrades correct deficiencies and avoid service reductions due to failure and overload of aging equipment. Third Rail and Heavy Traction Power Cables - Preventive maintenance work is performed where necessary to repair/replace heavy traction power cables that feed the third rail along the tracks currently in service at various locations throughout the rail system. Rail Signal Systems - Program provides for signal equipment repair along the rail right-of-way, signal equipment on rail cars, and the reconstruction of electronic components of the signal system, including relays and circuit boards. As necessary dedicated small renewals and system modifications are also completed. All work is planned/performed to maintain the asset(s) in proper working order through its quarter life cycle, while a more extensive rehabilitation is planned at the mid-life of the asset.