Capital Projects

Regional Capital Program

Download Capital Dataset

Capital programming is a core function of the RTA. RTA and the Service Boards have worked to articulate as well as advance a capital strategy for transit projects in the Chicagoland region.

Priority Projects have been identified by the Service Boards. These priority projects were defined in the Invest in Transit  Regional Transit Strategic Plan and are updated on an annual basis. This page shows details about the funding for each priority project.

The 2024-2028 5-Year Regional Capital Program includes over 250 projects that are advancing many of these Priority Projects. The capital projects are shown in the table below, organized by Priority Project and can also be seen in a mapped form on the RTA Capital Projects Dashboard. Each project listing shows the amount of funding programmed in the 2024-2028 Regional Capital Program. Beginning with the 2024-2028 Capital Program, projects are evaluated based on 15 measure which were identified in the new Regional Transit Strategic Plan, Transit is the Answer. All projects in the 2024-2028 program show the detailed evaluations in this site.

The metrics include evaluations of Equity and Accessibility which are used in the performance-based allocation process. The region has committed to dedicating 20% of programmed funds to projects that fulfill the regional goals of improving equity and accessibility for 2025 and beyond as a part of the new performance-based capital allocation process

The Service Boards have met and exceeded the 20% goal for the 2025-2028 budget years.

Detailed analysis of the capital evaluation metrics is included in the Regional Transit Operating Budget and Capital Program

Read more about RTA’s capital programming activities here.

Project Management Oversite (PMO) data is provided for projects that are being actively monitored by the PMO group. Data included current activities, start and end date and budget and schedule status. The following page has a full list of active PMO projects.

 

Search More info

Filter

Core Requirement(s) More info

Strategic Goal More info

Agency Priority Project Mode 2023 Fundingsort ascending 2023-2027 Funding 10 Year Funding Needed 10 Year Unfunded Need
+ Metra Rail Station Improvements Rail $295,524,917 $485,490,576 $747,272,085 $261,781,509

Description:

Rehabilitation and upgrades to station buildings, platforms, and parking lots

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ 59th/60th ST. Station (U. of Chicago) Stations & Passenger Facilities Rail $68,630,000 $78,100,000

PROJECT DETAILS

Description:

This project consists of the complete rehabilitation of the 59th/60th Street (U. of Chicago) station facility in Chicago along the Metra Electric Line. As part of the project, the 60th Street entrance will be reopened. Additional project elements include, but may not be limited to, lighting, sidewalk, bike facilities, landscape enhancements and other related work. The project will leverage $2,500,000 from the University of Chicago.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$37,600,000
$9,470,000
$47,070,000
State
$0
$12,000,000
$0
$12,000,000
RTA
$0
$17,030,000
$0
$17,030,000
Service Board / Local
$0
$2,000,000
$0
$2,000,000
Total
$0
$68,630,000
$9,470,000
$78,100,000

Last Updated 06.22.2023

+ 79th St., 87th St, 103rd St. Stations Metra Electric Stations & Passenger Facilities Rail $37,900,000 $37,900,000

PROJECT DETAILS

Description:

This project funds the complete rehabilitation of the 79th Street, 87th Street and 103rd Street Stations in Chicago along with the Metra Electric (ME) Line. The project scope includes the repair or replacement of aging shelter enclosures, station lighting upgrades, and platform renovation work. Additional project elements may include but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, bench repairs, and other related work as needed. The station will be made fully ADA accessible upon completion of the project.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$37,900,000
$0
$37,900,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$11,000,000
$37,900,000
$0
$48,900,000

PMO:

Total Project Budget^

$61,150,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

May 2020

End Date

Sep 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The designs for these stations have been completed. The Notice to Proceed with construction has been issued in January 2023. The contractor is currently working on permitting.

Last Updated 06.22.2023

+ 95th Street Station CSU Stations & Passenger Facilities Rail $34,000,000 $34,000,000

PROJECT DETAILS

Description:

This project will fund the rehabilitation of the 95th Street / Chicago State University Station on the Metra Electric Line in Chicago. The project elements may include the replacement and/or rehabilitation of station platforms, new lighting, rehabilitation of the headhouse, repair or replacement of roofs, installation of warming shelters, new platform amenities, and other related work. The project may also include wayfinding signage or other station identifiers. A new tunnel entrance will be added and parking facility upgrades will be completed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$29,000,000
$0
$29,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$5,000,000
$0
$5,000,000
Total
$3,000,000
$34,000,000
$0
$37,000,000

PMO:

Total Project Budget^

$53,000,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

May 2020

End Date

Dec 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The design for this station is 95% complete and the 100% design submittal is expected in July 2023. There were delays on this project associated with the National Environmental Policy Act (NEPA) review process as well as coordination with the Chicago State University and additional scope added to the design.

Last Updated 06.22.2023

+ Ticket Vending Machines Support Facilities & Equipment Rail $33,510,000 $43,250,000

PROJECT DETAILS

Description:

This project is the first phase of installing up to 310 ticket vending machines (TVMs) at selected stations throughout the Metra system to provide added amenities to Metra customers. The TVMs will offer a variety of ticket purchasing options and make purchasing tickets faster, easier, and more convenient for our customers. The TVMs will be fully ADA-accessible and will offer the ability to purchase tickets using contactless cards and mobile wallet applications and will no longer need to insert debit/credit cards into the machine.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$10,710,000
$0
$10,710,000
State
$0
$22,800,000
$9,740,000
$32,540,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$33,510,000
$9,740,000
$43,250,000

PMO:

Total Project Budget^

$12,650,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jan 2022

End Date

Dec 2026

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

This project is currently in the production phase. The manufacturing of the first 100 TVMs is in progress. Two machines were delivered to Metra and System Integration Testing was performed. The next four machines are scheduled to be delivered to Metra by the end of May. Those machines will be used for the pilot deployment at Union Station. Metra work forces are preparing the various site locations for installation of TVMs by performing electrical work and pouring/repairing concrete pads.

Last Updated 06.22.2023

+ Harvey Transportation Center - Metra Stations & Passenger Facilities Rail $20,850,000 $41,700,000

PROJECT DETAILS

Description:

Metra is partnering with Pace to create the Harvey Transportation Center on the Metra Electric line. Metra will utilize funds for platform reconstruction and to construct other enhancements that will make the station ADA accessible, improve the commuter environment, and facilitate intermodal transfers between Pace and Metra.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$8,100,000
$8,100,000
State
$0
$0
$12,750,000
$12,750,000
RTA
$0
$20,850,000
$0
$20,850,000
Service Board / Local
$0
$0
$0
$0
Total
$2,000,000
$20,850,000
$20,850,000
$43,700,000

PMO:

Total Project Budget^

$45,250,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Aug 2022

End Date

Aug 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

This project is in the design phase. The National Environmental Policy Act (NEPA) process has been completed. The design is progressing and is currently at 30% completion. Pace and Metra held an open house in January to get the community’s feedback on the design alternatives for the new Transportation Center. Community engagement is ongoing.

Last Updated 06.22.2023

+ Westmont Station Stations & Passenger Facilities Rail $18,900,000 $18,900,000

PROJECT DETAILS

Description:

This project involves installing a new heated-platform technology that the village requested. The heated platform will reduce the amount of snow and ice build-up during winter months, nearly eliminating the need for manual snow removal.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,900,000
$0
$1,900,000
State
$0
$17,000,000
$0
$17,000,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,000,000
$18,900,000
$0
$19,900,000

Last Updated 03.16.2023

+ West Chicago Station Stations & Passenger Facilities Rail $8,400,000 $14,600,000

PROJECT DETAILS

Description:

The project involves the rehabilitation of the West Chicago Station facility. Work to be done may include, but is not limited to, rehabilitation of the access tunnels, stairs, ramps, waiting room, platforms, lighting, retaining wall improvements, and painting. Project funds will be used for construction as design and engineering have been accomplished under a separate project.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$450,000
$450,000
State
$0
$0
$5,750,000
$5,750,000
RTA
$0
$8,400,000
$0
$8,400,000
Service Board / Local
$0
$0
$0
$0
Total
$300,000
$8,400,000
$6,200,000
$14,900,000

Last Updated 03.16.2023

+ South Water St. Station Stations & Passenger Facilities Rail $8,000,000 $8,000,000

PROJECT DETAILS

Description:

This project will provide construction funds to rehabilitate the South Water Street station access points and station facilities along the Metra Electric. The repair work may include, but is not limited to, replacement of floors and the suspended ceiling in the waiting area, updated lighting fixtures, restroom updates, and upgraded heating and air conditioning.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$8,000,000
$0
$8,000,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$8,000,000
$0
$8,000,000

Last Updated 03.16.2023

+ Olympia Fields Station Stations & Passenger Facilities Rail $7,270,000 $19,670,000

PROJECT DETAILS

Description:

This project will renovate the Olympia Fields station facility, including replacement of aging shelter enclosures, station lighting upgrades, platform renovation work, and pedestrian tunnel painting and sealing as needed. Additional project elements may include, but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, bench repairs, and other related work as needed. The Olympia Fields station will be made fully ADA-compliant.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$12,400,000
$12,400,000
State
$0
$0
$0
$0
RTA
$0
$7,270,000
$0
$7,270,000
Service Board / Local
$0
$0
$0
$0
Total
$0
$7,270,000
$12,400,000
$19,670,000

Last Updated 03.16.2023

+ Evanston Davis St. Station Stations & Passenger Facilities Rail $7,000,000 $17,945,000

PROJECT DETAILS

Description:

This project will completely rehabilitate the Evanston (Davis St. station) facility in downtown Evanston. The project scope includes extensive repairs to the station depot and platform shelters, station lighting upgrades, and platform renovation work. Retaining wall sections at intermittent locations along the right-of-way may be repaired as needed. Additional project elements may include, but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, entrance staircase repairs, and other related work as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$1,000,000
$10,945,000
$11,945,000
RTA
$0
$6,000,000
$0
$6,000,000
Service Board / Local
$0
$0
$0
$0
Total
$0
$7,000,000
$10,945,000
$17,945,000

Last Updated 03.16.2023

+ Platform Improvements Stations & Passenger Facilities Rail $6,800,000 $36,960,000

PROJECT DETAILS

Description:

This project is part of Metra’s ongoing effort to bring commuter rail stations into compliance with the
requirements of the Americans with Disabilities Act (ADA) of 1990. The project will focus on
platform and platform access routes, as necessary.
Wherever platform work is undertaken, the existing platforms will be rehabilitated in order to allow
deteriorated tactile surfaces to be replaced with new ADA-compliant “truncated dome” type surfaces.
FY 2020 Federal funds and 2020 Illinois PAYGO funds will be used for construction of new platforms,

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$800,000
$15,650,000
$16,450,000
State
$0
$6,000,000
$14,510,000
$20,510,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$4,500,000
$6,800,000
$30,160,000
$41,460,000

PMO:

Total Project Budget^

$6,000,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Sep 2020

End Date

Dec 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Platform work at Chicago-Ridge, Willow Springs, Mundelein, Jefferson Park, Barrington Station, Franklin Park, New Lenox, and West Hinsdale were completed. Work continued with the 103rd Street station platform and is at 40% complete.

Last Updated 06.22.2023

+ Elevator Replacement Stations & Passenger Facilities Rail $6,580,000 $15,405,000

PROJECT DETAILS

Description:

This project will replace or renovate elevators at various stations across the Metra system.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$6,580,000
$8,825,000
$15,405,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,450,000
$6,580,000
$8,825,000
$16,855,000

PMO:

Total Project Budget^

$300,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Jan 2021

End Date

Dec 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Metra continued the preparation of the final design Architectural and Engineering task orders for elevator replacement. The Randolph St. elevator has NEPA issues to resolve. The two other elevators at Grand & Cicero are at 90% and proceeding to 100% design completion.

Last Updated 06.22.2023

+ Rogers Park Station Stations & Passenger Facilities Rail $6,250,000 $33,250,000

PROJECT DETAILS

Description:

This project will completely rehabilitate the northern-most Metra station in Chicago. The Rogers Park station is located on the Union Pacific North (UP-N) Line atop a retaining wall section that was originally constructed in 1916. The project scope includes extensive repairs to the station depot and entrance ramps and shelters. Station lighting upgrades and platform renovation work will be completed as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$26,130,000
$26,130,000
State
$0
$0
$870,000
$870,000
RTA
$0
$6,250,000
$0
$6,250,000
Service Board / Local
$0
$0
$0
$0
Total
$1,400,000
$6,250,000
$27,000,000
$34,650,000

Last Updated 03.16.2023

+ 115th St Station Stations & Passenger Facilities Rail $6,000,000 $6,000,000

PROJECT DETAILS

Description:

This project will provide design engineering funds for the 115th St. (Morgan Park) station on the Rock Island (RI) Line in the Morgan Park neighborhood of Chicago. A new station warming shelter will be constructed with distinctive architectural elements and materials that are appropriate for the historic neighborhood. The project scope includes parking lot renovations, ADA improvements, the installation of shelters, bicycle parking, and landscaping improvements.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$6,000,000
$0
$6,000,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$870,000
$6,000,000
$0
$6,870,000

Last Updated 03.16.2023

+ TROI - NET Station Displays Support Facilities & Equipment Rail $4,899,917 $5,399,917

PROJECT DETAILS

Description:

The TROI-Net Station Displays Project is the design and rollout of the next generation of Metra's VIS Signs as they reach the end of their useful life and require replacement. Instead of one VIS Sign per station, TROI-Net Station Displays will be installed at more than one location at most stations. To meet accessibility requirements and like the current VIS Signs, TROI-Net Station Displays will provide the visual part of Metra's Audio/Visual announcements at stations.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$500,000
$500,000
$1,000,000
State
$0
$3,700,000
$0
$3,700,000
RTA
$0
$699,917
$0
$699,917
Service Board / Local
$0
$0
$0
$0
Total
$3,000,000
$4,899,917
$500,000
$8,399,917

Last Updated 06.22.2023

+ Kenilworth Station Stations & Passenger Facilities Rail $4,000,000 $4,000,000

PROJECT DETAILS

Description:

This project will rehabilitate the Kenilworth station facility. The project scope includes extensive repairs to the station depot, including tuckpointing, masonry restoration, and roof tile repairs. Additional project elements may include but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, entrance staircase repairs, and other related work as needed. This is a multi-year, multi-phase project.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$4,000,000
$0
$4,000,000
Service Board / Local
$0
$0
$0
$0
Total
$1,200,000
$4,000,000
$0
$5,200,000

Last Updated 12.16.2022

+ Millennium Station-MEP Upgrades Support Facilities & Equipment Rail $3,400,000 $3,400,000

PROJECT DETAILS

Description:

This project will fund upgrades to the aging Mechanical, Electrical, and Plumbing (MEP) systems at the Millennium Station, which is the downtown Chicago terminal of the Metra Electric (ME) Line. The scope of work may include, but is not limited to, replacement of the boiler system, replacement of the HVAC, upgrading MEP components, the installation of drainage solutions, related engineering design services, and other activities as needed. This is a multi-year, phase-funded project.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$3,400,000
$0
$3,400,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$800,000
$3,400,000
$0
$4,200,000

Last Updated 03.16.2023

+ Peterson Ridge New Station Stations & Passenger Facilities Rail $2,500,000 $2,500,000

PROJECT DETAILS

Description:

The new station in the Edgewater neighborhood of Chicago will be built to modern standards and feature a platform-length canopy and a heated headhouse. Four ADA-compliant pedestrian ramps and six staircases will provide numerous access points that are accessible to all. A landscaped plaza with benches and bicycle parking will be installed at the station entrance. A passenger drop-off drive aisle, five accessible parking stalls, and 50 parking stalls will be constructed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$2,500,000
$0
$2,500,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$200,000
$2,500,000
$0
$2,700,000

PMO:

Total Project Budget^

$22,829,765

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jul 2021

End Date

Dec 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Design for the new station was completed. The contracts for construction management and construction contractor were procured and awarded in June and July 2021, respectively. Notice to Proceeds were issued in June 2021 for the Construction Manager and August 2021 for the Construction Contractor. Construction is in progress and continues with the construction contractor working on platform level mechanical and electrical work, as well as structural work as Union Pacific continues to perform flagging activities for the station construction. The contractor will begin shortly with repairing and reinforcing the overpass next to the station. This includes rehabilitating and/or replacing elements of the Ridge Avenue bridge related to structural and concrete wall elements.

Last Updated 06.22.2023

+ Auburn Park New Station Stations & Passenger Facilities Rail $2,000,000 $4,200,000

PROJECT DETAILS

Description:

The new station in the Auburn Park neighborhood of Chicago will feature a platform-length canopy and heated headhouse with two elevators. The station will include a center boarding platform with a staircase down to street level entrance tunnel, a landscaped plaza with benches, canopy, bicycle parking, and a vendor space Metra will lease. A parking lot will include 79 parking stalls, 5 ADA parking spaces, and a passenger drop-off lane. The new station will be fully ADA accessible.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$2,000,000
$2,200,000
$4,200,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$4,300,000
$2,000,000
$2,200,000
$8,500,000

PMO:

Total Project Budget^

$37,300,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Dec 2021

End Date

Oct 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The new station will increase transit accessibility for the surrounding neighborhood. Benefits of this new station will reduce congestion on the Dan Ryan Expressway. The contractor is working on submittals. This project has encountered delays with the permits. The contractor is working on resolving issues related to permitting.

Last Updated 06.22.2023

+ Shelters Stations & Passenger Facilities Rail $2,000,000 $4,200,000

PROJECT DETAILS

Description:

This project will fund the installation of shelters at stations across the system, which will provide on-demand heat. Specific locations are to be determined, based on existing conditions and demand. Shelters will be pre-fabricated structures and may include on-demand heating elements.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$2,200,000
$2,200,000
State
$0
$2,000,000
$0
$2,000,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$2,500,000
$2,000,000
$2,200,000
$6,700,000

PMO:

Total Project Budget^

$3,000,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Oct 2020

End Date

Dec 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Aluminum shelters continue to be installed throughout the system including planned shelters at Morton Grove, Western Ave., 67th St., and 83rd St. stations. The Woodstock station design is at 90% design and proceeding to 100% final design. Design for new station shelters are at 30% design.

Last Updated 06.22.2023

+ Elmhurst Station Stations & Passenger Facilities Rail $2,000,000 $2,000,000

PROJECT DETAILS

Description:

This project will fund Metra’s portion of a larger station renovation/expansion in Elmhurst. It will leverage CMAQ funds obtained by the Village of Elmhurst to construct a larger station to accommodate the growing ridership.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$2,000,000
$0
$2,000,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,000,000
$2,000,000
$0
$3,000,000

PMO:

Total Project Budget^

$1,000,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jun 2022

End Date

Mar 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Preliminary engineering and NEPA process were completed. The Village of Elmhurst is leading the design with their consultant and proceeding to the 60% design submittal.

Last Updated 06.22.2023

+ Station ADA Improvements Stations & Passenger Facilities Rail $1,000,000 $3,110,000

PROJECT DETAILS

Description:

Project funds will be used to assess previously identified site and building conditions that are not compliant with ADA Accessibility codes and regulations. The project will fund the design and construction of corrective solutions.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,000,000
$2,110,000
$3,110,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$3,300,000
$1,000,000
$2,110,000
$6,410,000

Last Updated 12.16.2022

+ LaGrange Road Station Stations & Passenger Facilities Rail $900,000 $900,000

PROJECT DETAILS

Description:

This project consists of the rehabilitation of the LaGrange Road station facility in LaGrange along the BNSF line. The scope of work may include, but is not limited to, replacing the station depot and windbreak roofs, renovating the station depot heating and ventilations systems, brick and stone repairs and tuckpointing, and refinishing the interior of the station depot. Additional project elements include, but are not limited to, sidewalk accessibility improvements, bicycle facility upgrades, and drainage repairs.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$900,000
$0
$900,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,710,000
$900,000
$0
$2,610,000

Last Updated 12.16.2022

+ Parking Lot Improvements Stations & Passenger Facilities Rail $750,000 $4,220,000

PROJECT DETAILS

Description:

This project will fund major parking lot renovations throughout the system. Parking lots have a shorter useful life than stations, therefore, must be overhauled even if the station does not require rehabilitation. Project activities may include but are not limited to, parking surface grinding, asphalt peeling, asphalt resurfacing, blacktop seal coating, patch repairs, new or replacement signage, and the repair or replacement of collection boxes as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$750,000
$3,470,000
$4,220,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$500,000
$750,000
$3,470,000
$4,720,000

Last Updated 12.16.2022

+ 107th St. (Beverly Hills) Station Stations & Passenger Facilities Rail $600,000 $600,000

PROJECT DETAILS

Description:

This project will provide design engineering funds for the 107th St. (Beverly Hills) station on the Rock Island (RI) Line in the Beverly Hills neighborhood of Chicago. Rehabilitation of the existing station warming shelter that is appropriate for the historic neighborhood will be completed in future phases of the project. Project activities may include, but are not limited to, parking lot renovations, ADA improvements, new lighting around the station, additional shelters and bicycle parking, and other activities as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$600,000
$0
$600,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,000,000
$600,000
$0
$1,600,000

Last Updated 12.16.2022

+ Waukegan Station Stations & Passenger Facilities Rail $500,000 $500,000

PROJECT DETAILS

Description:

This project will rehabilitate the inbound and outbound platforms. Platform light poles and fixtures on both platforms will be replaced. New on-platform shelters will be removed and reinstalled. Project activities may also include renovations to the interior of the station depot.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$500,000
$0
$500,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$500,000
$0
$500,000

Last Updated 12.16.2022

+ Forest Glen Station Stations & Passenger Facilities Rail $400,000 $400,000

PROJECT DETAILS

Description:

The Forest Glen Station will undergo multi-phase rehabilitation. Phase 1 will replace the inbound and outbound platforms with new heated platforms that will include tactile strips for ADA compliance, reconstruct the entry staircase with heated stairs, and replace the deficient station depot with a temporary shelter. Following design engineering services, Phase 2 will add a new, heated station depot in place of the temporary shelter, new wayfinding signage, and other station identifiers. Upon completion of Phase 3, the station will be made fully ADA-accessible.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$400,000
$0
$400,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$400,000
$0
$400,000

Last Updated 12.16.2022

+ Solar Canopies Stations & Passenger Facilities Rail $300,000 $300,000

PROJECT DETAILS

Description:

Metra will investigate the feasibility of erecting solar canopy systems at Metra-owned stations and parking lots. Metra will study the benefits and costs of offering electric vehicle charging stations that utilize power derived from solar canopies positioned above parking stalls. Project activities include but are not limited to feasibility studies, site surveys, professional services, preliminary engineering, and construction activities.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$300,000
$0
$300,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$300,000
$0
$300,000

Last Updated 12.16.2022

+ Round Lake Station Stations & Passenger Facilities Rail $100,000 $1,975,000

PROJECT DETAILS

Description:

To accommodate the Cedar Lake Road Realignment project led by Lake County, portions of the Round Lake station will have to be relocated and reconstructed. The Cedar Lake Road will bisect the station's platform as they are currently located, therefore, the platforms will need to be rebuild due east. Lake County will fund the station infrastructure components that are directly impacted by the project in full. Metra is taking the opportunity to reevaluate the station site plan and to consider Metra-funded improvements. Funds programmed in 2022 will finance engineering and design services.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$100,000
$1,875,000
$1,975,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,500,000
$100,000
$1,875,000
$3,475,000

Last Updated 12.16.2022

+ Bicycle Parking Stations & Passenger Facilities Rail $85,000 $85,000

PROJECT DETAILS

Description:

Metra was awarded CMAQ grants for the purchase and installation of bicycle parking facilities at stations across the system. Specific locations are to be determined

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$85,000
$0
$85,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$76,500
$85,000
$0
$161,500

Last Updated 12.16.2022

+ Naperville Station Stations & Passenger Facilities Rail $0 $350,000

PROJECT DETAILS

Description:

This project will fund improvements to the Naperville station facility that also serves as an Amtrak train station. The canopy roof west of station depot is in disrepair and will be replaced with a new cantilevered canopy. The project will also improve or replace stair enclosures based on surveyed conditions. Customer amenities will be enhanced by expanding waiting areas, the installation of additional bicycle racks, and the replacement of the exisiting shelters over the bicycle parking areas.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$350,000
$350,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$350,000
$350,000

Last Updated 12.16.2022

+ Systemwide Station Signs Stations & Passenger Facilities Rail $0 $7,500,000

PROJECT DETAILS

Description:

This project will replace all Metra station identification throughout the Metra system. These signs were installed in the early 1980s and are reaching the end of useful life. The new signs will be designed to comply with the Americans with Disabilities Act (ADA).

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$7,500,000
$7,500,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,500,000
$0
$7,500,000
$9,000,000

Last Updated 12.16.2022

+ 63rd Street Station Stations & Passenger Facilities Rail $0 $100,000

PROJECT DETAILS

Description:

This project will study potential improvements to the station which may include but are not limited to restoration of the viaduct, replacement of staircases, the potential addition of an elevator, design of a new gatehouse and platform head house, the feasibility of extending the boarding platforms, and consideration of a platform-length canopy.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$100,000
$100,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$100,000
$100,000

Last Updated 12.16.2022

+ Arlington Park Station-Parking Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

Metra intends to exercise a clause in the lease contract to purchase the parking lot area for the Arlington Park station on the Union Pacific Northwest (UP-NW) Line. Metra has leased a 9.3-acre parking lot from the owners of the Arlington Park Racecourse since 2002. It was announced in 2021 that the horse racing track would close, and the property will be sold off. Metra seeks to purchase the land to avoid annual rent costs, which will result in significant savings, and to allow flexibility for long-range planning of the station.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$6,237,000
$0
$0
$6,237,000

Last Updated 12.16.2022

+ River Forest Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will rehabilitate the River Forest station and associated retaining walls that are located along the Union Pacific West (UP-W) Line. The historic station was originally constructed in 1915 and is currently inaccessible. The project scope includes extensive repairs to the entrance ramps, retaining walls, and platforms. Additional project elements may include but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, entrance staircase repairs, and other related work as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$900,000
$0
$0
$900,000

Last Updated 12.16.2022

+ 83rd Street (South Chicago) Station Stations & Passenger Facilities Rail $0 $225,000

PROJECT DETAILS

Description:

The project may include but is not limted to repairing wind break shelters, the rehabilitation or replacement of the station depot and canopy shelter, addition of a new staircase, handrails, and an ADA ramp (if feasible) at the intersection of 82nd and Commercial. Site Amenities, signage and wayfinding

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$225,000
$225,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$225,000
$225,000

Last Updated 12.16.2022

+ Blue Island Transfer Facility Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project includes, but is not limited to, the complete rehabilitation of the RID Vermont Street
station in Blue Island. Work for this project will include, but not be limited to, historic rehabilitation,

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$983,006
$0
$0
$983,006

Last Updated 12.16.2022

+ Kedzie Station-Retaining Wall Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will fund the repair of a retaining wall and staircase located at the entrance to the Kedzie station on the UP-W Line. The retaining wall is integral to the station and needs to be repaired to improve safety and avoid additional damage to the infrastructure of the station.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$250,000

Last Updated 12.16.2022

+ Glen Ellyn Station Stations & Passenger Facilities Rail $0 $4,000,000

PROJECT DETAILS

Description:

This project will fund repairs at the Glen Ellyn station facility. The project scope may include, but not be limited to, depot repairs, entrance stairs repairs, and new signage. Additional project elements may include, but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, bench repairs, station lighting upgrades, and other related work as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$4,000,000
$4,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$4,000,000
$4,000,000

Last Updated 12.16.2022

+ South Shore Station Stations & Passenger Facilities Rail $0 $380,000

PROJECT DETAILS

Description:

This project will provide construction funds to rehabilitate the South Water Street Station access points and station facility along the Metra Electric. The repair work may include, but is not limited to, the replacement of floors and the suspended ceiling in the waiting area, updated lighting fixtures, restroom updates, and upgraded heating and air conditioning.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$380,000
$380,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$380,000
$380,000

Last Updated 12.16.2022

+ Passenger Information Electrical, Signal & Communications Rail $0 $0

PROJECT DETAILS

Description:

The current General Electric announcement system has become outdated and there are no upgrades available. This project will include, but is not limited to, the purchase and installation of LCD displays and associated communications equipment throughout the Metra system. This project will allow for more timely information on arriving trains and allow for improvements including digital LCD displays and automated announcements. The displays could show train(s) arriving at the station, estimated time of arrival, stops made by the train, and any service alerts that may influence service.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,223,788
$0
$0
$1,223,788

Last Updated 12.16.2022

+ Downtown Station Signs Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will design, purchase, and install new digital train tracking displays and backlit station identification signs. Video boards will display real-time train tracking and service alerts as well as other visual information. At least one sign is planned to be installed at and or near the primary entrance to Metra's five downtown Chicago terminals. New train tracking displays will improve our communication with the customer and better accommodate ESL and/or non-English speakers and improve ADA compliance.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,530,000
$0
$0
$1,530,000

Last Updated 12.16.2022

+ Ashland Station Stations & Passenger Facilities Rail $0 $126,659

PROJECT DETAILS

Description:

This project will rehabilitate the aged timber deck platform, and add new lighting around the station facility. The project may include a new warming shelter, staircase improvements, and the installation of a new ADA Ramp to platform. Enhanced customer amenities may include a new station amenities, wayfinding, signage, benches, and parking lot improvements.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$126,659
$126,659
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$126,659
$126,659

Last Updated 12.16.2022

+ Hubbard Woods Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project includes the rehabilitation of the historic north head house, replacement of the platforms, construction of a pedestrian bridge, installation of elevators to the platforms and platform shelters. Design engineering services for the station rehabilitation is currently underway.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$17,000,000
$0
$0
$17,000,000

Last Updated 12.16.2022

+ 147th St. - Sibley Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project consists of the complete rehabilitation of the 147th St. (Sibley Blvd.) station facility in Harvey along with the Metra Electric (ME) Line in Harvey. The project scope includes renovation of the station entrance, heated warming shelters, a canopy over half of the platform. Additional project elements include, but may not be limited to, lighting, sidewalk, bike facilities, landscape enhancements, and other related work.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$9,400,000
$0
$0
$9,400,000

PMO:

Total Project Budget^

$20,862,735

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Jan 2022

End Date

Dec 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Construction activities are ongoing at the station. The contractor is working on preparations for the elevator installation by forming and placing rebars at the headhouse and elevator walls. Forming, rebar placing, and electrical conduit work is ongoing at the ground level station entrance walls. Contractor is also working on assembling and installing north and south platform and canopy structural steel. Procurement of major equipment such as transformers and platform panels has been completed.

Last Updated 06.22.2023

+ 111th St. Station / Pullman Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will fund the rehabilitation of the 111th Street / Pullman Station on the Metra Electric District Line in Chicago. The project elements may include the replacement and/or rehabilitation of
station platforms, new lighting, gatehouse/head house rehabilitation, replacement of leaking roofs, installation of new warming shelters, new platform amenities, and other related work. The project may
also include wayfinding signage or other station identifiers.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$20,750,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

May 2020

End Date

Dec 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The design for this station is 40% complete. The design is currently on hold until the National Environmental Policy Act (NEPA) review process is complete. Coordination with the State Historic Preservation Office (SHPO) is required as part of the NEPA process since the station is located in a historic district.

Last Updated 06.22.2023

+ Downtown Public Address System Electrical, Signal & Communications Rail $0 $0

PROJECT DETAILS

Description:

This project consists of purchasing public address (PA) equipment that will be used at various locations in Metra's downtown Chicago terminals. The new PA system will be designed to comply with the Americans with Disabilities Act (ADA).

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,800,000
$0
$0
$1,800,000

Last Updated 12.16.2022

+ Van Buren St. Station Stations & Passenger Facilities Rail $0 $15,624,000

PROJECT DETAILS

Description:

A complete renovation of the downtown Chicago terminal station will rehabilitate the existing historic waiting rooms, replace the roof assembly while maintaining the green roof, and will replace the pedestrian tunnel in the park. A new 'pop-up' entrance in Grant Park will add a new access stair case and elevator and add an ADA-compliant ramp connecting to the pedestrian bridge. The pedestrian tunnel under Michigan Ave will be waterproofed and a new elevator will be added to the Jackson Blvd platform.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$15,624,000
$15,624,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$15,624,000
$15,624,000

PMO:

Total Project Budget^

$48,126,300

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jun 2018

End Date

Dec 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Metra awarded the consultant contract for station concept design. The concept design is at 15% completion and on hold pending completion of lakefront ordinance protection, NEPA, and environmental processes. Documents are being prepared to be submitted for lakefront ordinance for approval. Environmental and NEPA work is ongoing.

Last Updated 06.22.2023

+ Congress Park Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will provide construction funds for the rehabilitation of the Congress Park station facility along the BNSF Line. The station will be rehabilitated to be ADA compliant.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,000,000
$0
$0
$1,000,000

Last Updated 12.16.2022

+ 91st Street-Beverly Station Stations & Passenger Facilities Rail $0 $700,000

PROJECT DETAILS

Description:

The project may include but is not limted to restoration of the Historic Depot, including insulating the walls and ceiling, and adding new windows, improving the waiting room, and other interior improvements. A new shelter and a reconstructed parking lot may be considered and may require land aquisition or land swap with the city of Chicago. Improvements to the foundation may including raising a portion of the building to eliminate the existing ramp to platform.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$700,000
$700,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$700,000
$700,000

Last Updated 12.16.2022

+ Highlands Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will renovate the Highlands station in Hinsdale. The project scope includes the repair or replacement of aging shelter enclosures, station lighting upgrades, and platform renovation work as needed. Additional project elements may include, but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, and other related work as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$750,000
$0
$0
$750,000

Last Updated 12.16.2022

+ 103rd Street - Washington Heights Station Stations & Passenger Facilities Rail $0 $415,000

PROJECT DETAILS

Description:

Rehabilitate Depot, Rehab Stair and Ramp and Handrails, Peel and Pave outbound Platform, add 181' new Timber Box Platform for 510' length platform (6-Car). Demolish Inbound Platform and replace with new 510' Timber Box Platform. (1) New Shelter. Grind and resurface south parking and Replace North Parking and Drive Aisle. SIte Amenities including VIS, Signs, Wayfinding, benches and lighting

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$415,000
$415,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$415,000
$415,000

Last Updated 12.16.2022

+ West Hinsdale Station Stations & Passenger Facilities Rail $0 $5,000,000

PROJECT DETAILS

Description:

This project will provide design engineering funds for platform rehabilitation of the West Hinsdale station facility along the BNSF Line. The station will be rehabilitated to be ADA compliant. Construction funds are provided in later years

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$5,000,000
$5,000,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,000,000
$0
$5,000,000
$6,000,000

Last Updated 12.16.2022

+ Clarendon Hills Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project redevelops the Clarendon Hills Station on the Metra BNSF line. The station improvements include new platrofm canopies, enclosed shelters, benches, and covered bike parking. The shelters will feature green roofs. The parking lot improvements will feature kiss‐and‐ride areas on both sides of the tracks. Landscaping improvements will also be included.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$3,750,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Jan 2020

End Date

Mar 2022

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Metra entered into an Intergovermental Agreement (IGA) with the Village of Clarendon Hills for the reconstruction of the station. This project is part of the Village of Clarendon Hills downtown revitalization project. The Village procured a contractor and led the construction project. The substantial completion was reached in the first quarter of 2022. This is the final update on this project.

Last Updated 07.10.2022

+ Western Ave Station BNS Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project funds the design and renovation of the Western Avenue station facility in the West Side of Chicago along the BNSF Line. The project scope may include, but is not limited to, the repair or replacement of aging shelter enclosures, station lighting upgrades, and platform renovation work. Additional project elements may include, sidewalk repairs, upgraded bike facilities, landscape enhancements, and other related work as needed. The station will be made fully ADA accessible upon completion of the project.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$300,000
$0
$0
$300,000

Last Updated 12.16.2022

+ Clybourn Station Stations & Passenger Facilities Rail $0 $100,000

PROJECT DETAILS

Description:

Replace and Widen west platform to 510' x 24' to accomodate new elevator. Requires realignment of track and replacement of Armitage Road Bridge (single track). Add 3 new headhouses with APTA elevators and new stairs, add (5) additional new stairs for access and egress. Provide (8) new shelters. (4) new 300' by 10' Canopies. Replace remainig platforms with new 510' long platforms. Replace south parking with dual lane turnaround and drop off and replace and reconfigure remaining parking (10+ spots). Replace and Rehab retaining walls. Tunnel rehab and extension. Site amenities.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$100,000
$100,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$100,000
$100,000

Last Updated 12.16.2022

+ Station Improvements Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

State of good repair (SOGR) deficiencies at Metra stations that have been previously identified will be addressed by this project. Repair costs, labor, and construction materials will be funded by this annual project. Specific activities may include but are not limited to, the repair or replacement of roofs, masonry improvements, and tuck-pointing, door and window replacement, concrete repair work, improvements to interior spaces, replacement or repair of lighting, drainage improvements, and repairs to exterior station elements.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$800,000
$0
$0
$800,000

Last Updated 12.16.2022

+ Luminous Platform Signs Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

The scope of work would include the design, fabrication, installation, and 3 years of warranty and maintenance of thin panel LED, luminous platform signs at up to six Metra stations. Training for Metra staff for the ongoing troubleshooting and operations of the new signs, and training of Metra staff and forces for the potential installation of future phases of luminous signs would also be included. Limited user testing and customer survey evaluations would also be included.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$141
$0
$0
$141

Last Updated 12.16.2022

+ University Park Station-Ramps & Canopies Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will provide construction funds for the rehabilitation of the University Park station along the Metra Electric (ME) Line. The station will be rehabilitated to be ADA compliant and the existing pedestrian ramps will be renovated. Additional construction funds will be provided in future programs.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,200,000
$0
$0
$1,200,000

Last Updated 12.16.2022

+ Homewood Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

Additional construction funds are provided to this project to complete the rehabilitation of the Homewood Metra Station and associated intermodal facilities on the Metra Electric (ME) Line. The scope of work may include, but is not limited to, general tunnel rehabilitation, tunnel drainage solutions, elevator and stair improvements, the addition of a pedestrian ramp into the tunnel on the west end of the station, platform improvements, warming shelter, and head house improvements, and improvements to the Pace and Amtrak facilities.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$7,717,185
$0
$0
$7,717,185

PMO:

Total Project Budget^

$23,278,976

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

May 2021

End Date

Dec 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The parking lot with 53 parking spaces was completed. The 100% station design review was completed in this reporting period by Metra and their PMO. The General Contractor was given NTP in March, and crews have mobilized on site with site prep underway as well as push submittals for long lead time items.

Last Updated 06.22.2023

+ Hickory Creek Station Stations & Passenger Facilities Rail $0 $6,200,000

PROJECT DETAILS

Description:

This project will rehabilitate the Hickory Creek station in Mokena. The project will fund the repair of the depot an the station facilities. Platform work may be included as needed. Additional project elements may include, but are not limited to, sidewalk repairs, upgraded bike facilities, landscape enhancements, station lighting upgrades, and other related work as needed.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$6,200,000
$6,200,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,000,000
$0
$6,200,000
$7,200,000

Last Updated 12.16.2022

+ Indian Hill Station Stations & Passenger Facilities Rail $0 $1,300,000

PROJECT DETAILS

Description:

New Stair access and New Elevator at East (Inboound). Rehab Tunnel, Rehab Historic Canopies and wind breaks, Rehab Historic Depot for ADA access, tuck point masonry as required, New ADA ramp near Depot, Peel and Pave at Parking (110,000sf)

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$1,300,000
$1,300,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$1,300,000
$1,300,000

Last Updated 12.16.2022

+ Ogilvie Station Tile Replacement Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project will replace tile flooring in the Ogilvie Transportation Center concourse. This project will install vapor barriers and replace existing floor tiles with new slip-resistant floor tiles where necessary.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$250,000

Last Updated 12.16.2022

+ CTA Bond Repayment, Interest Cost & Finance Cost System $197,095,845 $1,011,656,756 $1,874,473,580 $862,816,824

Description:

Support CTA Debt

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ CTA Bond Repayment - Principal/Interest Miscellaneous System $197,095,845 $1,011,656,756

PROJECT DETAILS

Description:

Bond Repayment, Interest Cost, & Finance Cost: Provide for debt service and the cost of issuance of bonds, notes and other indebtedness incurred by the CTA.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$197,095,845
$814,560,911
$1,011,656,756
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$317,940,808
$197,095,845
$814,560,911
$1,329,597,564

Last Updated 12.16.2022

+ CTA All Stations Accessibility Program Rail $189,925,938 $232,025,938 $473,900,000 $241,874,062

Description:

The purpose of this Program is to support accessibility in locations throughout the CTA system. ASAP’s emphasis is on making all platforms and stations vertically accessible so that people with mobility impairments can use the rail system. ASAP upgrades also include accessible entrances/doors, accessible routes from curbs to platforms, improved directional signage, enhanced lighting as appropriate, removal of platform obstructions, and accessible employee facilities.

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ All Stations Accessibility Program - Irving Park Station Construction Stations & Passenger Facilities Rail $113,620,000 $113,620,000

PROJECT DETAILS

Description:

Fully fund Irving Park - O’Hare Blue.
Scope of work for this station includes:
• Two new stationhouses each with a CA kiosk and elevators providing access to the north and south ends
of the platform;
• To add accessibility at this station, the existing stationhouse on the south side of Irving Park Road is
proposed to be converted to a stationhouse without a CA kiosk; and
• The stationhouse on the west side of Pulaski Road will remain unchanged.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$84,000,000
$0
$84,000,000
State
$0
$29,620,000
$0
$29,620,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$113,620,000
$0
$113,620,000

Last Updated 03.15.2023

+ All Stations Accessibility Program - Oak Park, Ridgeland, Partial Construction - Lake Green Line Stations & Passenger Facilities Rail $40,439,991 $40,439,991

PROJECT DETAILS

Description:

Partial Construction funds will provide for the Oak Park & Ridgeland Stations on the Green Line.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$8,925,938
$0
$8,925,938
State
$0
$31,514,053
$0
$31,514,053
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$40,439,991
$0
$40,439,991

Last Updated 03.15.2023

+ All Stations Accessibility Program - Pulaski Station Stations & Passenger Facilities Rail $34,480,000 $34,480,000

PROJECT DETAILS

Description:

The project will reconstruct the main Pulaski entrance to replace the current non-compliant ramp to platform level with one elevator and one staircase. The closed Keeler Ave. auxiliary entrance will be reopened, and the ramp will be reconstructed to meet accessibility requirements for landings, providing a redundant pathway not dependent on an elevator. All station signage will be updated for improved wayfinding. At platform level, passenger amenities such as benches or shelters, will be improved with a focus on the head car location where most passengers with disabilities ride.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$34,480,000
$0
$34,480,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$34,480,000
$0
$34,480,000

Last Updated 03.15.2023

+ All Station Accessibility Program & Canopies at Montrose Stations & Passenger Facilities Rail $1,385,947 $1,385,947

PROJECT DETAILS

Description:

This job order will provide for the design/construction of two new elevators at the Montrose Blue Line Station. Further this project will fund replacement of canopies at Montrose station.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$1,385,947
$0
$1,385,947
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$6,317,875
$1,385,947
$0
$7,703,822

PMO:

Total Project Budget^

$23,317,875

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Apr 2045

End Date

Nov -0001

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The Notice to Proceed for the design has been issued in May 2023. The kickoff meeting was held and the design validation is in progress.

Last Updated 06.22.2023

+ All Station Accessibility Program - Austin Station Support Facilities & Equipment Rail $0 $0

PROJECT DETAILS

Description:

Rehabilitate Rail Stations - ASAP (AUSTIN)
This project is part of CTA’s All Stations Accessibility Program (ASAP). The goal of ASAP is to create a vertically accessible rail system within 20 years. ASAP also adds accessibility features to vertically inaccessible stations such as sidewalks and crosswalks, power-assisted doors, accessible fare array, braille and signage, accessible Customer Assistance (CA) kiosks and staff toilet rooms, enhanced lighting as appropriate, and expanded platform clearances for wheelchair maneuverability.
Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$13,930,000
$0
$0
$13,930,000

PMO:

Total Project Budget^

$25,564,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Apr 2021

End Date

Dec 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The design for this project has been completed. The procurement process for the construction general contractor is ongoing with the bids due in June.

Last Updated 06.22.2023

+ All Station Accessibilty Program - Station Design/Consultant Services (Oak Pk, Ridgeland, Irving Pk, Belmont, Grand, and Division) Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

Project provides funding to complete the 100% design plan for all six targeted Stations. Additional funding will be made available to retrofit or rebuild stations to achieve make vertically accessible.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$26,000,000
$0
$0
$26,000,000

Last Updated 12.16.2022

+ All Station Accessibilty Program - Elevator Replacement Stations & Passenger Facilities Rail $0 $8,916,776

PROJECT DETAILS

Description:

Funding will provide for second installment of funds to rehabilitate and/or replace elevators throughout the system. This funding along with the granted Rebuild Illinois funds provide in part for phase one of the program.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$8,916,776
$8,916,776
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$11,585,000
$0
$8,916,776
$20,501,776

PMO:

Total Project Budget^

$25,370,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Jun 2022

End Date

Mar 2026

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The Notice to Proceed for the designer has been issued in June 2022. The designer is completing site assessments and elevator inspections. An assessment report will be developed to prioritize the elevator replacement or rehabilitation locations. The report will also provide the scope of work needed for each individual elevator. A draft report is expected to be submitted to CTA in June. Once the report is finalized, CTA will issue a procurement for construction based on the priority recommendations from the assessment report.

Last Updated 06.22.2023

+ All Station Accessibility Program - California Station Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

This project with provide for the renovation and expansion of the California Station. It will include a new platform, new emergency exist stairs and two new elevators. The station will be 100% ADA accessible. In addition, state of good repair work will be performed as part of the station renovation.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$9,570,000
$0
$0
$9,570,000

PMO:

Total Project Budget^

$36,000,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Feb 2022

End Date

Nov 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The Notice to Proceed has been granted to the designer in February 2022. The 60% design is underway and is expected to be submitted to CTA at the end of May. The real estate survey has been completed to determine property acquisition needs for the placement of elevators.

Last Updated 06.22.2023

+ All Stations Accessibility Program Phase II (ELEVATOR REPLACEMENT) Stations & Passenger Facilities System $0 $18,183,224

PROJECT DETAILS

Description:

CTA developed the Elevator Replacement Program to strategically maintain existing passenger elevators across the rail system as vertical accessibility is expanded via ASAP. The Elevator Replacement Program will rehabilitate or replace existing passenger elevators throughout the CTA rail system to reduce the backlog of elevator rehabilitation and replacement needs and bring them into a state of good repair.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$18,183,224
$18,183,224
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$18,183,224
$18,183,224

Last Updated 12.16.2022

+ All Stations Accessibility Program - Escalator Replacement Stations & Passenger Facilities System $0 $15,000,000

PROJECT DETAILS

Description:

Project will fund the replacement of a select number of escalators. CTA is currently in development of a PPS document to prioritize the replacement effort.

This program upgrades or replaces aging escalators within the system. The general scope of work includes: demolition of the existing escalator, modification of the existing
structure, and fabrication and installation of the new escalator. Stations along the Blue line
O’Hare branch have been identified as priority locations for escalator replacement.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$15,000,000
$15,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$15,000,000
$15,000,000

Last Updated 12.16.2022

+ All Stations Accessibility Program - Belmont Station Construction Stations & Passenger Facilities Rail $0 $0

PROJECT DETAILS

Description:

Fully fund Belmont O’Hare Blue.
Scope of work for this station includes:
• Maintain all existing stairways and escalators;
• Provide one elevator for access between street level and the unpaid side of the stationhouse;
• Provide one elevator for access between the paid side of the stationhouse and the platform; and
• Install and emergency stairway at the south end of platform and provide street-level exit at northeast quadrant of Barry Ave./ Kimball Ave.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

Last Updated 03.15.2023

+ CTA New Control and Training Center System $175,000,000 $175,000,000 $0 $0

Description:

Construct new CTA complex (campus) to include a Control Center and Training Facility. The facility will be equipped with modern state of the art technology, heighten security criteria and redundant power sources. The Control Center portion of campus will include an auditorium, situation room, network operations center, and communication and training rooms. While, the new training facility portion of the campus will contain offices, classrooms, and conference rooms for CTA employee training. The training facility will contain both bus and railcar inspection pits including embedded rail track and testing track for rail operations.

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ New Control & Training Center Support Facilities & Equipment System $175,000,000 $175,000,000

PROJECT DETAILS

Description:

CTA complex (campus) to include a Control Center and Training Facility. The facility will be equipped with modern state of the art technology, heighten security criteria and redundant power sources. The Control Center portion of campus will include an auditorium, situation room, network operations center, and communication and training rooms. While, the new training facility portion of the campus will contain offices, classrooms, and conference rooms for CTA employee training.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$175,000,000
$0
$175,000,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$142,270,670
$175,000,000
$0
$317,270,670

Last Updated 03.15.2023

+ CTA Red Line Extension Rail $154,480,519 $339,480,519 $3,541,709,184 $3,202,228,665

Description:

Extension of the Red Line from 95th Street to 130th Street

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ Red Line Extension - Planning, Preliminary Engineering Extension Rail $154,480,519 $339,480,519

PROJECT DETAILS

Description:

Red Line Extension Planning, Preliminary Engineering
Funds will provide for planning, program management, and preliminary engineering services for the anticipated extension of the south leg of the Red Line. Funding will allow for the CTA to continue project work through the Project Development phase where the Final Environmental Impact Statement (EIS) and Preliminary Engineering for the project will be completed.
CIP also provides the 30% non-Capital Improvement Grant match ($310M) commitment needed to successfully complete Project Development.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$30,000,000
$30,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$154,480,519
$155,000,000
$309,480,519
Total
$60,240,816
$154,480,519
$185,000,000
$399,721,335

Last Updated 12.16.2022

+ Metra Fleet Modernization Plan Rail $143,772,626 $700,981,585 $1,797,589,605 $1,096,608,020

Description:

Replace and repair aging commuter rail cars and locomotives

Project Title Asset Category Mode 2023 Funding 2023-2027 Funding PMO
+ New Bi-Level Rail Cars Purchase Rolling Stock Rail $52,500,000 $285,624,000

PROJECT DETAILS

Description:

This project funds the long-term railcar replacement program and will purchase up to 500 state-of-the-art railcars. The modern, multilevel railcars will offer a smoother and more comfortable ride. Metra's new railcars will have two entranceways on each side with doors nearly level to the platform which will improve the speed of boarding and deboarding at each station. Boarding will require only one step to enter and faster wheelchair lifts will bridge the slight difference between the station platform and the floor of the railcars.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$111,303,000
$111,303,000
State
$0
$22,400,000
$121,821,000
$144,221,000
RTA
$0
$30,100,000
$0
$30,100,000
Service Board / Local
$0
$0
$0
$0
Total
$0
$52,500,000
$233,124,000
$285,624,000

PMO:

Total Project Budget^

$847,056,032

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Apr 2021

End Date

Mar 2027

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The final design document packages are being completed and submitted to Metra. All responses from the Intermediate Design Review have been addressed. The Final Design Review is scheduled to take place May through August 2023. The contractor has built a new facility to produce the rail cars. The facility is scheduled to be ready for operation in the second quarter of 2023. The first cars are expected to arrive at Metra in April 2024.

Last Updated 06.22.2023

+ F59 Locomotive Engine Upgrade Rolling Stock Rail $33,540,000 $66,040,000

PROJECT DETAILS

Description:

This project will overhaul 21 F59PHI locomotives to keep them in a state of good repair. The main engine will be upgraded from Tier 0+ to Tier 3 emissions and the HEP genset will be upgraded from Tier 2 to Tier 4i.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$33,300,000
$32,500,000
$65,800,000
State
$0
$240,000
$0
$240,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$33,540,000
$32,500,000
$66,040,000

Last Updated 06.22.2023

+ Car Rehab (Nippon Sharyo P-5) Rolling Stock Rail $23,110,982 $64,110,982

PROJECT DETAILS

Description:

This project involves the mid-life rehabilitation of bi-level trailer and cab cars. Nippon Sharyo Corporation built and delivered the cars between 2002 and 2008. This is the first major rehabilitation of these commuter cars and will be performed in multiple phases.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$23,110,982
$41,000,000
$64,110,982
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$27,220,994
$23,110,982
$41,000,000
$91,331,976

Last Updated 12.16.2022

+ Car Rehab (Nippon Sharyo Highliners) Rolling Stock Rail $15,021,644 $92,532,466

PROJECT DETAILS

Description:

This project funds the continued rehabilitation of self-propelled electric cars used on the Metra Electric. The cars delivered between 2005 and 2007. This first rehabilitation may include, but is not limited to, repair of the car body structure, interior components, and overhaul of propulsion control systems.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$15,021,644
$77,510,822
$92,532,466
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$12,000,000
$15,021,644
$77,510,822
$104,532,466

PMO:

Total Project Budget^

$40,357,012

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Nov 2021

End Date

Dec 2025

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

This project is progressing with procurements for materials and parts underway. Two cars have completed the rehab activities, and four cars are almost completed waiting on seats. Two more have just started work under this program. Additional cars will continue with the rehabilitation process.

Last Updated 06.22.2023

+ Switch Locomotive Procurement Rolling Stock Rail $5,500,000 $5,500,000

PROJECT DETAILS

Description:

Metra will procure 7 new, cleaner switcher locomotives to retire the current fleet that first went into service at least 50, and as many as, 85 years ago. One all-electric, zero-emission switch locomotive would be the first in Metra’s fleet. Six additional switch locomotives purchased under this project will meet the Environmental Protection Agency’s (EPA) Tier IV standards, the highest emission standards currently in effect.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$5,500,000
$0
$5,500,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$5,500,000
$0
$5,500,000

Last Updated 06.22.2023

+ Wheel Replacements Rolling Stock Rail $4,000,000 $20,000,000

PROJECT DETAILS

Description:

This project will implement the FRA-mandated replacement of wheelsets on Metra’s fleet of locomotives and commuter cars. The replacement wheels will be used on vehicles being operated on all carriers and railroads in the Metra system as part of an ongoing program to overhaul major rolling stock components.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$4,000,000
$16,000,000
$20,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$4,000,000
$4,000,000
$16,000,000
$24,000,000

Last Updated 12.16.2022

+ Car and Locomotive Cameras Rolling Stock Rail $2,000,000 $8,000,000

PROJECT DETAILS

Description:

This project involves the purchase of a digital video recording (DVR) system. The system will replace the 12-year old, obsolete system currently running on Metra’s rolling stock. The new system will allow for video recording of railroad signal aspects and incidents and includes inward-facing cameras and outward-facing, dual-lens cameras.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$2,000,000
$6,000,000
$8,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$2,000,000
$2,000,000
$6,000,000
$10,000,000

PMO:

Total Project Budget^

$17,970,921

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Nov 2018

End Date

Dec 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The new technology allows recording at a faster frame rate and higher resolution, allowing slowing down the recording to less than real time rates without distortion, blurring, or loss of resolution. Currently, the DVR system is being installed by Metra Forces. All prototype installations were completed with them running with no issues. The full-scale installation began, and kits started delivery in October. In total, 47 cars were completed, and the project is on-going and continuing installation activities.

Last Updated 06.22.2023

+ Locomotive and Car Improvements Rolling Stock Rail $2,000,000 $8,000,000

PROJECT DETAILS

Description:

This project involves the purchase of a digital video recording (DVR) system. The system will replace the 12-year-old, obsolete system currently running on Metra’s rolling stock. The new system will allow for video recording of railroad signal aspects and incidents and includes inward-facing cameras and outward-facing, dual-lens cameras.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$2,000,000
$6,000,000
$8,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$2,000,000
$2,000,000
$6,000,000
$10,000,000

Last Updated 12.16.2022

+ Traction Motors Rolling Stock Rail $1,800,000 $6,600,000

PROJECT DETAILS

Description:

This project funds the overhaul of traction motors and traction alternators for locomotives. This project also involves the overhaul of auxiliary generators and head-end-power (HEP) alternators. The overhauled equipment will be used on locomotives operated on railroads either owned or operated by Metra. A basic overhaul is required to return these motors to an acceptable level of performance.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,800,000
$4,800,000
$6,600,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,800,000
$1,800,000
$4,800,000
$8,400,000

Last Updated 12.16.2022

+ Battery Powered Locomotives Rolling Stock Rail $1,500,000 $1,500,000

PROJECT DETAILS

Description:

This project will fund the conversion of three diesel locomotives to zero-emission battery power. The battery powered locomotives will be fully compatible with Metra's existing fleet and will be capable of operating on any Metra line that uses diesel-hauled trains. The batteries will provide motive power as well as onboard systems such as lighting, intercoms, and HVAC.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,500,000
$0
$1,500,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$20,000,000
$1,500,000
$0
$21,500,000

Last Updated 06.22.2023

+ GPS Train Tracking Support Facilities & Equipment Rail $1,500,000 $1,500,000

PROJECT DETAILS

Description:

This project involves the replacement of the current GPS, which has exceeded its useful life. Metra will replace the GPS, on-board announcement system and signs on the entire fleet. Metra will also install automatic passenger counters and event recorders. The new system will maintain the necessary current functions, while potentially adding video surveillance, customer information displays and an information system. This project will enable Metra to track trains, count passengers and provide information with one system.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,500,000
$0
$1,500,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$6,692,784
$1,500,000
$0
$8,192,784

PMO:

Total Project Budget^

$35,742,146

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Nov 2018

End Date

Dec 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The project design is 100% complete. The First Article of Inspection and training were completed. All installation work on the MED and RID yards were completed. Station control unit for station announcements installations were completed. Field testing is ongoing. Production installation phase is ongoing for all districts with cab car installation at 78% completion; trailer car installation is at 1% completion.

Last Updated 06.22.2023

+ Nippon Sharyo Car Improvements Rolling Stock Rail $1,300,000 $1,300,000

PROJECT DETAILS

Description:

This project involves the purchase of parts and equipment that will be needed for the rehabilitation and restoration of the 26 electric cars that were ordered in 2002 and delivery began in 2004/5.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$1,300,000
$0
$1,300,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$1,300,000
$0
$1,300,000

Last Updated 12.16.2022

+ Vehicle Inspection System Rolling Stock Rail $0 $0

PROJECT DETAILS

Description:

This project consists of a Pantograph inspection system and ultrasonic detection system that will allow for the real-time inspection of cars and locomotives. The powerful diagnostic support can identify issues while rolling stock is in service. The high speed cameras are strategically placed so as not to interrupt operations.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$491,696
$0
$0
$491,696

Last Updated 12.16.2022

+ Zero-Emissions Locomotives Rolling Stock Rail $0 $36,274,137

PROJECT DETAILS

Description:

Metra investment in innovative, cleaner energy locomotives will be funded in part by this project which will procure locomotives that produce zero mobile emissions. This multi-year, multi-phase project will acquire state-of-the-art technologies and pilot their performance capabilities given Metra’s track profile and the Chicago region’s inclement weather patterns.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$29,024,137
$29,024,137
State
$0
$0
$7,250,000
$7,250,000
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$15,750,000
$0
$36,274,137
$52,024,137

PMO:

Total Project Budget^

$15,000,000

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Dec 2022

End Date

Dec 2027

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Metra put the bid on the street in May 2022 and Metra continues to work on the procurement activities for this project.

Last Updated 06.22.2023

+ Automatic Passenger Counters Support Facilities & Equipment Rail $0 $0

PROJECT DETAILS

Description:

Automatic passenger counting on all coaches for planning and passenger communication purposes. We can use the feed to tell operations when coaches are full and how many people are boarding at each station. It will also allow us to tell the riding public which cars on the trains have seats available or which trains they can take that are not at capacity.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$1,000,000
$0
$0
$1,000,000

Last Updated 12.16.2022

+ Remanufactured Locomotive Purchase Rolling Stock Rail $0 $0

PROJECT DETAILS

Description:

This project involves the purchase of up to forty-two (42) remanufactured diesel locomotives. The
contract has a base order of fifteen (15) locomotives with three (3) Options to order nine (9) additional
locomotives each. Metra ancipicates these locomotives to have increased horsepower, lower emissions,
and greater fuel efficiency than the current fleet average.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$185,377,931

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Apr 2020

End Date

May 2024

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The first four locomotives have been delivered to Metra. The first maintenance training sessions have been completed and mainline testing for the locomotives will begin in June. Upon successful completion of the mainline testing the locomotives will move to revenue service testing in July and August. The remaining 11 locomotives are in various stages of production and testing.

Last Updated 06.22.2023

+ Car Rehab - Budd Rolling Stock Rail $0 $0

PROJECT DETAILS

Description:

This project involves the life‐extending rehabilitation of up to 85 commuter cars,
originally built by the Budd Company between 1974 and 1978, last rehabilitated
between 1990 and 1993. The rehab includes, but is not limited to, replacement
and/or repair to electrical and control lines, heating and lighting systems,
replacement of seats, floors, walls, AC units, overhaul of trucks, replacement of all
windows, door mechanisms, and emergency lighting requirements, etc..

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$31,962,888

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Nov 2014

End Date

Oct 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

This project will improve the overall state of good repair for Metra rolling stock. As with the locomotive rehabilitation projects, vehicles are being removed from service in such a manner as to not disrupt operations. Seventy-one cars completed the rehabilitation continues with the remaining cars as they cycle through the rehabilitation program. The next phase of the rehabilitation work will be installing new AC units into the cars. Additional cars are being completed as a more precise and limited rehab program.

Last Updated 06.22.2023

+ Locomotive Rehab Units 100-149,215,216 Rolling Stock Rail $0 $0

PROJECT DETAILS

Description:

This project continues Metra's ongoing locomotive rehabilitation program. It consists of the life-extending rebuild of F40 locomotives and the mid-life overhaul of MP36 locomotives. A locomotive rehabilitation is less expensive than a purchase, saving approximately $5 million per vehicle. The project may include, but is not limited to, the complete rebuild of a diesel engine, overhaul of the Head End power alternator and gear boxes, and painting and body repair.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$5,050,000
$0
$0
$5,050,000

PMO:

Total Project Budget^

$6,875,000

Budget Status

On Budget

Schedule Status

Behind Schedule

Start Date

Nov 2020

End Date

Dec 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

Rehabilitation on four locomotives are in process and four completed. Metra continues to receive kits and in-house rehabilitation activities are in progress.

Last Updated 06.22.2023

+ Car Rehab (Nippon Sharyo P-3) Rolling Stock Rail $0 $0

PROJECT DETAILS

Description:

This project funds the continued rehabilitation of self-propelled electric cars used on the Metra Electric. The cars delivered between 2005 and 2007. This first rehabilitation may include, but is not limited to, repair of the car body structure, interior components, and overhaul of propulsion control systems.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$0
$0
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$0
$0

PMO:

Total Project Budget^

$103,383,678

Budget Status

On Budget

Schedule Status

On Schedule

Start Date

Sep 2020

End Date

Dec 2023

^Total Project Budget is the project budget being tracked by the RTA PMO Group

Current Status

The project is currently in phase 7 of 10 of the rehabilitation process. As of the end of April, 197 cars were completed with another three expected to be completed in May.

Last Updated 06.22.2023

+ Car Rehab - Midlife (Amerail) Rolling Stock Rail $0 $84,000,000

PROJECT DETAILS

Description:

This project involves the life extension rehabilitation of bi-level trailer and cab cars. Morrison Knudsen Corporation built and delivered the cars between 1994 and 1998. This is the second major rehabilitation of these commuter cars and will be performed in multiple phases.

Core Requirement(s)
Maintain and Improve Safety and Reliability
Achieve Full Accessibility
Meet Regulatory Requirements
Improve Equity
Strategic Goal
Deliver Value on Investment
Build on the Strengths of Our Network
Stay Competitive

Funding Amounts by Source:

*Previous funding shows all funding since 2021, but not with detail by funding source. Note that the project may have funding from capital programs previous to 2021 that is not shown in table
Source Previous Funding* 2023 Funding 2024-2027 Funding Total
Federal
$0
$0
$84,000,000
$84,000,000
State
$0
$0
$0
$0
RTA
$0
$0
$0
$0
Service Board / Local
$0
$0
$0
$0
Total
$0
$0
$84,000,000
$84,000,000

Last Updated 12.16.2022

+ Zero-Emissions Trainsets Rolling Stock Rail $0 $20,000,000

PROJECT DETAILS

Description:

Metra's investment in innovative, cleaner energy locomotives will be funded in part by this project which will procure multiple-unit car that produce zero mobile emissions. This multi-year, multi-phase project will acquire battery-electric trainsets. Metra will be among the first passenger rail transit agencies to purchase and operate self-propelled trainsets that will not require the construction and maintenance of wayside power.

Core Requirement(s)