Planning Programs and Projects

This page allows users to search for projects from the RTA’s Planning Programs. Users can search for projects by name or keyword from the Search bar or the Filter pulldown menus. 

Table results display summary information about each project. To view more details for a project, select the + icon to expand the view for additional information.

?

This search filters based on details within the Planning Project. The search box below allows users to search by Planning Project name.

Year Project Title Program Project Type Project Partner Budget Funding Source(s) Status Sort descending
+ Pace Local Transit Planning For Hoffman Estates, Waukegan and Woodridge Community Planning Transit Improvement Plan Pace Suburban Bus $150,000
  • Local
  • Federal
Completed

Project Details

Description

This project funded technical assistance to Pace to enable them to conduct the following studies: The Green Bay Road Flexible Transportation Study in Lake County; the Barrington Road / I-90 Hoffman Estates Circulator and Land Use Study; and the Woodridge Park and Ride Transportation Plan.

Current Activities

The Hoffman Estates study recommended transit service alternatives, revised land uses and bicycle / pedestrian improvements. In 2018 Pace launched I-90 Express Bus services to the new Barrington Road Station as well as the new Route 612, Barrington Road Cirulator in Hoffman Estates.

In 2021 the former AT&T campus in Hoffman Estates opened as Metroburb, a new mixed-use district featuring office, retail and residential accommodationsin close proximity to the Barrington Station. The Woodridge study recommends the area around I-355 and 75th as the preferred location for an I-55 Bus on Shoulder park-n-ride facility. At this location, the Centerpointe of Woodridge is the preferred site due to its proximity near this interchange and site factors that support the development of park-n-ride service. Additionally, this site also has the potential to also serve as a remote park-n-ride facility with connecting service to Metra BNSF stations. Since completion of the Plan Pace has been evaluating the capacity/equipment/garage constraints of I-55 service as it related to a new Woodridge Park and Ride, as well as future development of the Bus on Shoulder corridor. The Green Bay Road final report was completed and delivered in December 2016.

Funding Amounts by Source
Source Amount
Local $30,000
Federal $120,000

Last Updated 03.03.2021

+ Chicago Transit-Friendly Development at CTA Stations Community Planning Transit-Oriented Development Plan Chicago $250,000
  • RTA
  • Local
Completed

Project Details

Description

The City of Chicago, in conjunction with the Chicago Transit Authority (CTA), looked at three elevated train station areas (Berwyn on the Red Line, 43rd Street on the Green Line and a potential infill station near Cermak on the Green Line) and developed comprehensive land use (urban design) and transportation plans for each station. This study was an important first step in the citywide effort to strengthen the relationship between land use and transportation, plan for neighborhood growth and enhancement, inform future development and redevelopment decision-making, and guide public and private investment in three station areas.

Current Activities

The new Cermak-McCormick Place Green Line Station, funded with $50 million in City TIF funds, opened for service in February 2015. A new entertainment district between McCormick Place and the station has been developing since 2015, including the new Wintrust Arena and four new hotels, three of which provide a connection via a skybridge to McCormick Place's west building.

A 24-story, 275-unit building in the McCormick Square area and one block from the station wasa completed in 2020 and the same developer is seeking zoning approval to construct a 12-story apartment building immediately south of it, at Wabash and Cermak.

The Chicago Housing Authority has engaged a developer to redevelop the site of the former Harold Icks Homes at State and Cermak, directly across State Street from the green line station. The new development, named Southbridge, will be mixed-income, mixed-use and will include retail space as well as up to 900 rental and for-sale housing units. Phase I, which includes two mixed-use residential buildings, was completed in 2022.

Funding Amounts by Source
Source Amount
RTA $200,000
Local $50,000

Last Updated 10.25.2022

+ Fox Lake Station Area Plan Community Planning Transit-Oriented Development Plan Fox Lake $100,000
  • RTA
  • Local
Completed

Project Details

Related Reports
Description
This project created a transit-oriented development plan for the Metra station area located in the Village's downtown. The Village plans to provide recommendations to improve walkability and improve streetscaping, redevelop vacant and underutilized land, promote the Village as a tourist destination and encourage the use of Metra.
Current Activities
The Village Board formally adopted the Plan on August 13, 2013. To continue support of the Village's TOD efforts, the RTA selected the Village as part of the 2014 Community Planning Program of Projects for a Developer Discussion Panel. The Panel convened on February 10, 2015 and a summary of this discussion can be found on the Fox Lake Developer Discussion Panel RTAMS page.

In September of 2017 the Village Board designated the Fox Lake station area as a Business District, where an additional 1% sales tax will be applied to generate revenue for promoting redevelopment and constructing public infrastructure.
Funding Amounts by Source
Source Amount
RTA $80,000
Local $20,000

Last Updated 07.01.2019

+ Elmwood Park Station Area Plan Community Planning Transit-Oriented Development Plan Elmwood Park $95,117
  • Local
  • Federal
Completed

Project Details

Description

This project assessed current conditions and recommended improvements for the Elmwood Park station area located on the Metra Milwaukee District West Line. The plan identified transit supportive opportunities and addressed auto and pedestrian circulation issues.

Current Activities

The study was completed in July 2006. In June 2021 the Village of Elmwood Park purchased the vacant lot at 7505 W. Grand Avenue, across from the Metra station, to facilitate future development.

The RTA is monitoring progress and will provide technical assistance and support as needed.

Funding Amounts by Source
Source Amount
Local $19,023
Federal $76,094

Last Updated 10.25.2022

+ Mokena Developer Discussion Panel Community Planning Developer Panel Mokena $3,500
  • RTA
Completed

Project Details

Description
The RTA coordinated with the Urban Land Institute (ULI) to bring in a panel of development experts to provide guidance and advice on ways the community can attract TOD investment in their Metra station area.
Current Activities
This panel convened in November 2012 and a summary of this discussion can be found in the Study Documents below. The RTA is monitoring progress and will offer assistance with implementation as needed.
Funding Amounts by Source
Source Amount
RTA $3,500

Last Updated 10.07.2014

+ Pace I-355 Express Bus Community Planning Transit Improvement Plan Pace Suburban Bus $265,984
  • RTA
  • Local
Completed

Project Details

Related Reports
Description
This study developed a plan for a fully integrated sustainable corridor through the development of an express bus service on the I-355 corridor between New Lenox and Lake-Cook Road. It examined ways of improving transit as well as transit support facilities within the entire corridor.
Current Activities
The recommendations presented in this final report are currently being applied to the Pace I-90 Express Bus Network and the Pace Cook-DuPage Transit Investment Plan.
Funding Amounts by Source
Source Amount
RTA $212,787
Local $53,197

Last Updated 06.13.2017

+ Brookfield Developer Discussion Panel - Brookfield Station Community Planning Developer Panel Brookfield $3,000
  • RTA
Completed

Project Details

Description

This project assisted the Village of Brookfield with a Developer Discussion Panel to gather guidance and advice from development experts. The objective is to attract development to vacant sites and encourage infill development. The Developer Discussion Panel helped the Village determine goals and needs in order to best utilize the land.

Current Activities

The panel was held in August 2018 with members of the Village of Brookfield, ULI Chicago and the RTA in attendance. The Village continues to experience incremental growth near the Brookfield station in the form of new apartment development.

A summary report can be found to the right in Related Reports.

Funding Amounts by Source
Source Amount
RTA $3,000

Last Updated 07.23.2021

+ Chicago - Jefferson Park Station Area Master Plan Community Planning Transit-Oriented Development Plan Chicago $125,000
  • RTA
  • Local
  • Federal
Completed

Project Details

Description

This project assisted the City of Chicago in creating a comprehensive, station area master plan for the Jefferson Park neighborhood in the vicinity of the Jefferson Park Transit Center. This plan developed recommendations for transit access improvements and transit-supportive land uses that will complement the renovated Jefferson Park Transit Center, which facilitates CTA Rail and Bus, Metra Rail and Pace Bus service.

Current Activities

The plan was reviewed and adopted by the Chicago Plan Commission on December 20, 2018. The CTA completed station renovation work in 2019. The RTA further supported implementation activities by convening a panel of developer experts in June of 2021 to provide detailed guidance to attract infill redevelopment along Milwaukee Avenue.

During the summer of 2021 the People's Alley identified in the plan will be constructed in the alley between 4870 N Milwaukee and 5438 W Higgins. The alley will feaure a pedestrian plaza, new pavers, decorative overhead lights, seating and an identifying arch at the entrance.

In January of 2021 Chicago's City Council Committee on Housing and Real Estate unanimously voted to approve the sale of the property at 4841 N. Lipps Ave., formerly the Jefferson Park Firehouse, to a developer with plans to convert it into a mixed used development, with a first floor brewery with residential units on the upper floors.

Funding Amounts by Source
Source Amount
RTA $20,000
Local $25,000
Federal $80,000

Last Updated 07.23.2021

+ Greater Roseland (Chicago) Transit-Linked Community Development Project Community Planning Transit Improvement Plan Developing Communities Project (DCP) $150,000
  • RTA
  • Federal
Completed

Project Details

Description
This is a research and strategic planning project to identify the transit-linked opportunities for community development in the Greater Roseland community of Roseland, Pullman, West Pullman, Riverdale and Morgan Park, focusing on the potential of the proposed CTA Red Line South Extension. The project will assess the impact mass transit can have on housing, the economy and work force development in the Greater Roseland area.
Current Activities
The Final Plan was adopted by the Developing Communities Project Board of Directors in November 2009. The Alternatives Analysis for the CTA Red Line South extension was completed by the CTA in 2009 and the Environmental Impact Statement is set to be published in 2015. Three options are under evaluation for the Locally Preferred Alternative along the Union Pacific Railroad (UPRR) tracks including an option within the existing freight right-of-way (ROW Option), an East Option, and a West Option. The CTA is also evaluating a rail alternative along Halsted Street, a bus rapid transit (BRT) alternative along Michigan Avenue, and the No Build Alternative. For more information please visit: http://www.transitchicago.com/redeis/
Funding Amounts by Source
Source Amount
RTA $30,000
Federal $120,000

Last Updated 03.24.2015

+ Naperville Metra Station Bus Depot and Commuter Access Feasibility Study Community Planning Transit Improvement Plan Naperville $79,159
  • RTA
  • Local
Completed

Project Details

Description
This project identified opportunities to enhance commuter access to the Naperville Metra station by evaluating alternative modes of transportation such as bus, bicycle and walking. The project evaluated the feasibility of a bus depot, provided access and circulation improvements, and prepared recommendations to create a safer and more efficient multi-modal environment.
Current Activities
On April 17, 2012 the Naperville City Council accepted the Naperville Metra Station Bus Depot and Commuter Access Feasibility Study Technical Memorandum and directed staff to incorporate improvements into their Capital Improvement Program. On February 19, 2013, the City of Naperville FY14-18 Capital Improvement Program was adopted by the City Council. It contained the following improvements related to this study: modifications to the Eastern Burlington Lot on the north side of the train tracks; modifications to the south side of the train tracks; and conversion of North Avenue (currently one-way westbound) to two-way traffic between Washington Street and Ellsworth Street. Engineering is programmed for FY13-14, with phased construction currently planned for FY15-16 through FY16-17.

In late 2013 the City of Naperville received CMAQ approval for the Washington Street Corridor Centralized Traffic Management System and Washington Street Corridor Adaptive Signal Control projects. These projects install a centralized traffic management system and adaptive signal controls along Washington Street, in the study area of the Naperville Metra Station Bus Depot and Commuter Access Feasibility Study. For more information please visit http://www.cmap.illinois.gov/mobility/strategic-investment/cmaq. Naperville continues to look for funding for pedestrian access to implement additional recommendations.
Funding Amounts by Source
Source Amount
RTA $63,327
Local $15,832

Last Updated 01.04.2017